Time-and-Materials, Labor-Hour, and Letter Contracts
48 C.F.R. Part 3416, Subpart 3416.6
in effect48 C.F.R. § 3416.603-3 Limitations.
If the HCA is to sign a letter contract as the contracting officer, the SPE signs the written determination under FAR 16.603-3.
