§ 8-31 — Building permits and permit fees
The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 8-31
Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/e0cfd0ba-0361-407a-97ca-1ac8db92ec58
Sec. 8-31. - Building permits and permit fees.
(a) [Applications.] Applications to the department of public works for the issuance of a building permit for the construction of a new dwelling, from one (1) to four (4) units in design, intended principally for residential purposes, but excluding any unit to be a primary residence of the builder, shall include a copy of such applicant's certificate of registration issued by the secretary of state pursuant to the provisions of A.C.A. ch. 17, tit. 47 [A.C.A. § 17-47-101 et seq.], and a statement by such applicant that such certificate of registration is in full force and effect. (b) Special building permit fees: All residential building, electrical, plumbing and mechanical fees in the Central High, Downtown, and Philander Smith Targeted Neighborhood Enhancement Areas shall be figured in accordance with this section for establishing fees. Final assessments of said fees shall be reduced by seventy-five (75) percent rounded off to the nearest dollar, but in no case shall a fee be assessed at less than the minimum cost as established in subsection(c)(I). Mixed occupancies with residential occupying more than seventy-five (75) percent of floor space shall be assessed at the residential fee rate. All other occupancies in the designated areas shall have fees assessed in accordance with section 8-31. (c) Fees. The following are hereby established as permit fee schedules for building, electrical, plumbing, mechanical and other related work in the city. (1) Building permit fees, miscellaneous fees and general regulations. a. Permit fees. Permits are required for any work that exceeds five thousand dollars ($5,000.00), including material and labor, or that requires an inspection, except for residential fences less than seven (7) feet in height, residential roofs, painting, floor coverings and cosmetic changes, one-story detached accessory structure used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed two hundred (200) square-feet, are excluded. Proper documentation, i.e., copy of contract or letter of affidavit from applicant, must be presented when obtaining a permit. If documentation is not present, or cannot be obtained, the latest building valuation data chart as published by the International Code Council will be used in determining permit fees. Fees on work requiring a building permit as set forth in the Building and Safety Codes adopted by the city shall be paid as required at the time of filing an application. b. Certificate of occupancy fees. 1. Certificate of occupancy fee for a new commercial building or addition with an associated building permit - sixty-one and 80/100 dollars ($61.80). 2. Residential certificate of occupancy associated with a new single-family residence, new duplex, or new townhouse thirty and 90/100 dollars ($30.90). 3. Certificate of occupancy fee for existing buildings or change in in use only one hundred three dollars ($103.00). 4. Temporary or partial certificate of occupancy as set forth in subsection (c)(l)v. 5. Certificate of occupancy update - one hundred three dollars ($103.00). c. Minimum fee. Minimum fee for any building permit, except as otherwise specified, shall be fifty-one and 50/100 dollars ($51.50). d. Commercial plan-checking fee. When the valuation of the proposed construction exceeds five thousand dollars ($5,000.00) and a plan is required to be submitted in accordance with the Arkansas Fire Prevention Code, a plan-checking fee shall be paid to the building codes division at the time of submitting plans and specifications for checking. Said plan-checking fee shall be equal to one-half (½) of the building permit fee. Minimum fees shall fifty-six and 65/100 dollars ($56.65) for new construction (added square feet) repair, remodels and miscellaneous permits requiring plan review. Such plan-checking fee is in addition to the building permit fee and is non- refundable. e. Data processing fee. The following is hereby established as the data processing fee schedule for building, electrical, plumbing, mechanical, zoning, civil, and other related work in the city. Collected fees shall be placed in a separate account and shall be used for the purpose of purchasing and maintaining data processing equipment, software and providing general training for planning and development staff, or as determined by the planning and development director. All purchases shall not be made without prior written approval from the planning and development director. The data processing fee is in addition to the permit charge and is non-refundable. Classification of Work Residential or Commercial Permits .....$25.75 Act 474 of 1999 surcharge. As required by Act 474 of 1999, a surcharge of fifty cents ($0.50) per each one thousand dollars ($1,000.00) of construction authorized on any non-residential construction permit issued by the city will be imposed to financially support the craft training education program, with a maximum surcharge to be one thousand dollars ($ 1,000.00). f. Inspection fees for the moving of houses, HUD-certified manufacture homes, and modular buildings. Moving structure off lot .....$103.00 Moving structure on same lot .....$ 51.50 Required inspection before move inside city .....$ 51.50 Required inspection before move from city from Pulaski County of adjacent county .....$ 51.50 Required inspection for move to city from outside adjacent counties, but in the state of Arkansas, or from out of state .....$103.00 (plus $ 0.41 per mile round trip plus expenses) g. Demolition of structure. Ten cents ($0.10) per square foot of floor area. Minimum fee of fifty-one dollars and 50/100 ($51.50). Demolition permits shall expire one (1) year from issuance date except in cases where structure is declared to be an imminent danger. h. Blasting fee. In addition to insurance and bond as required in Ordinance No. 11,361 (February 18, 1 963), a permit fee of one hundred three dollars ($103.00) for the first day and fifty-one and 50/100 dollars ($51.50) for each additional day shall be charged. i. Parking lot fees. A minimum routing fee of fifty-one dollars and 50/100 ($51.50) shall be charged and permit fees shall be assessed as set forth in subsection 8-31 (c)(1)a. j. Construction shack or field office. Fee of fifty-one and 50/100 dollars ($51.50) with site plan. Fee waived if included with permit applications. k. Tent permit. Fee of fifty-one and 50/100 dollars ($51.50) upon proper completion of fire department approval form. l. Swimming pools. Fees assessed per subsection 8-31(c)(l)a., but minimum fee shall be fee of fifty-one and 50/100 dollars ($51.50). m. Fuel tank or pump. Each (new or replacement) will be fifty-one and 50/100 dollars ($51.50). n. Miscellaneous permit fees. Satellite dishes, solar panels, towers and cell sites, fire alarm systems, fence, indoor or outdoor storm shelter, and any other miscellaneous permit, unless previously outlined, shall be assessed as set forth in subsection 8-3 l(c)(l)a. Retaining walls four (4) feet or more in height specifically used for retaining dirt or fill shall be designed, approved and stamped by a licensed design professional at time of application in accordance with the current city-adopted building codes. Fees shall be as set forth in subsection 8-31 (c)(1)a. o. Fire department permits and inspection fees. 1. The permit fee for new installations and/or replacement of fire sprinklers shall be assessed as follows: A. Buildings or structures with one (1) to five thousand (5,000) square feet shall be assessed forty-three cents ($0.43) per square foot. Buildings or structures with five thousand one (5,001) square feet and up shall be assessed as two hundred six dollars ($206.00) for the first five thousand (5,000) square feet plus twenty-two cents ($0.22) for each additional square foot and up. In no case shall a permit fee be less than fifty-five dollars ($55.00). 2. The permit fees for other various fire suppression systems shall be as follows: A. The permit fee for a standpipe system shall two hundred sixteen and 30/100 dollars ($216.30). On combination standpipe and sprinkler systems the sprinkler permit fee includes the standpipe fee. B. The permit for a carbon dioxide fire suppression system shall two hundred sixteen and 30/100 dollars ($216.30) for the first two hundred (200) pounds of agent plus twenty-two cents ($0.22) for every pound in excess of two hundred (200) pounds. C. The permit fee for a clean agent suppression system shall be two hundred sixteen and 30/100 dollars (216.30) for the first thirty-five (35) pounds of agent plus sixty-five cents ($0.65) for each pound of agent in excess of thirty-five (35) pounds. D. The permit fee for a foam suppression system shall be $0,527 per gallon of foam concentrate where the system is not part of an automatic sprinkler system. Foam suppression systems that are submitted as part of an automatic sprinkler system shall be reviewed under the sprinkler fee schedule. The minimum fee shall be two hundred sixteen and 30/100 dollars ($216.30); the maximum fee shall be one thousand six hundred twenty-two and 25/100 dollars ($1,622.25). E. The permit for a range hood suppression system shall be two hundred sixteen and 30/100 dollars ($216.30). F. The permit fee for a dry chemical suppression system shall be two hundred sixteen dollars and 30/100 dollars ($216.30) for the first thirty (30) pounds of agent plus $0.27 for each pound in excess of thirty (30) pounds. 3. The inspection fee for various fire alarm and other miscellaneous fees shall be as follows: A. Fire alarm test four (4) stories and above: Inspection fee: .....$216.30 Re-inspection fee: .....$108.15 B. Fire alarm test up to three (3) stories: Inspection fee: .....$108.15 Re-inspection fee: .....$ 54.59 C. Tent inspection: .....$ 54.59 D. Ansul system inspection: .....$108.15 E. Knox-box lock inspection: .....$ 54.59 F. Investigative fee: .....$ 54.59 G. Re-inspection fee: .....$ 54.59 4. Collected fees shall be distributed as follows: A. Fire department: fees collected deposited in fire marshal's education and training account. p. Investigative fee. In those instances wherein the information submitted to obtain a permit is inadequate or incomplete, or work has begun without a permit, or an inspection is required to determine the "on-site" conditions prior to issuance or denial of a permit, the building codes division may charge the owner an investigative fee of forty-six and 35/100 dollars ($46.35). The payment of the investigative fee shall not exempt any person from compliance with the provisions of the Code, or from any penalty prescribed by law. q. Re-inspection fee. A re-inspection fee of forty-six and 35/100 dollars ($46.35) will be charged when an additional trip is made by an inspector due to rejections, lockouts, insufficient information as to location of building or structure, work not ready for inspection, or any other cause due to neglect or failure on the part of the applicant. r. Penalties (working without a permit). Where work for which a permit is required by a current city-adopted building or safety code or a provision of the city Code is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled; however, payment of such triple fee shall not relieve any person from fully complying with the requirements of such codes in the execution of the work nor from any penalties prescribed herein and no additional permits shall be granted until all fees have been paid. s. Copy fees. 1. Duplicate permit card (lost, stolen, misplaced, etc.) .....$6.18 per card 2. Permit background computer readout .....$1.08 per copy 3. Copier fees .....$0.2625 per copy 4. Duplicate copy of certificate of occupancy .....$11.33 per copy t. Reserved. u. Expiration of permits/permit refunds. 1. All permits issued by the building codes division shall expire one (1) year from the date of issuance. Extensions of up to one (1) year after the expiration date may be granted for each permit. The request for extension must be in writing to the building codes division and must show just cause. A fee of one hundred three dollars ($103.00) shall be assessed for each year extension. 2. All permits issued by the building codes division shall expire one (1) year from the date of issuance. Extensions of up to ninety (90) days may be granted for permits where the original fee was less than-one hundred three dollars ($103.00). The fee for each ninety-day extension shall be the same as the original permit fee cost. 3. All permits shall become invalid if work authorized is not commenced within six (6) months of permit issue date, or if the work authorized is suspended or abandoned for a period of six (6) months after work commences. Before work can be resumed, a new permit must be obtained. The permit fee shall be one-half (½) the amount required for a new permit, provided no changes have been made in the original plans and specifications for such work, and provided that suspensions or abandonment have not exceeded six (6) months. 4. A permittee holding an unexpired permit may apply for a one-time extension, provided they can show good and satisfactory reason, and beyond their control the work cannot be commenced within the six-month period from the issue date. In order to renew work on a permit after it has expired, the permittee shall pay a fee in accordance with subsection 8-31 (c)(1)u.1. or 8-31(c)(l)u.2. 5. In cases where a change in contractor is made prior to completion of the job. The permit fee shall be assessed based on the stage of approval of inspections. The fee assessment shall be prorated in accordance with the number of remaining inspections. Inspections consist of the following: Building: Footing, framing, final. Electrical: Pipe-in wall, rough, final. Plumbing: Slab, rough, final. Mechanical: Duct work, rough, final. 6. Permit refunds issued in accordance with finance department guidelines. v. Temporary certificate of occupancy ninety (90) days. 1. Commercial. sixty-one and 80/100 dollars ($61.80). Single buildings, apartments, motels, hotels and multi-tenant occupancies when permitted under same contractor or owner shall be assessed as follows: sixty-one and 80/100 dollars ($61.80) for the first five (5) units and five and 15/100 dollars ($5.15) for each additional unit. A one-time extension of thirty (30) days may be granted if applicant can show just cause for temporary certificate of occupancy to be extended. Applicant shall pay extension fee of eighty-two and 40/100 dollars ($82.40) for each extension request. 2. Residential. Fifty-one dollars and 50/100 dollars ($51.50). Temporary certificate of occupancies issued for residential occupancies shall expire ninety (90) days from date of issuance. A one-time extension of thirty (30) days may be granted if applicant can show cause for temporary certificate of occupancy to be extended. Applicant shall pay an extension fee of seventy-two dollars and 10/100 dollars ($72.10) for each extension request. Failure to obtain a permanent certificate of occupancy after expiration of a temporary certificate of occupancy may result in issuance of a citation for appearance in Little Rock District Court. This may also include disconnection of utilities. Fines for occupying a structure without a permanent certificate of occupancy may be assessed up to two hundred fifty-seven and 50/100 dollars per day for each occurrence. (2) Electrical permit fees. a. New construction. 1. One- and two-family dwelling: Ten cents ($0.10) per square foot under roof. 2. All other occupancies: As set forth in the unit cost schedules in subsection 8-31(c)(2)c. b. Repair/alteration/addition to existing construction. As set forth in the unit cost schedules in subsection 8-31(c)(2)c. 1. Meter loops. A. First .....$16.48 B. Additional .....$ 8.24 2. Load centers, regardless of voltage. Up to 60 amps .....$ 9.27 Up to 100 amps .....$18.54 Up to 150 amps .....$28.84 Up to 200 amps .....$39.14 Over 200 [amps] .....$ 6.18 per 100 amps over 200 amps 3. Openings. 1 to 20 .....$12.36 21 to 60 .....$28.84 61 to 100 .....$35.02 101 to 200 .....$58.71 201 to 300 .....$76.22 301 to 400 .....$93.73 For each 25 over 400 .....$ 6.18 4. Motor and generator wiring. Up to 1 hp .....$6.18 2 to 4 hp or kW .....$9.27 5 to 10 hp or kW .....$14.42 11 to 15 hp or kW .....$17.51 16 to 20 hp or kW .....$21.63 21 or over hp or kW .....$25.75 Fraction horsepower motors can be grouped for their total horsepower and paid for as one (1) unit. 5. Temporary power to building .....$25.75 6. Smoke or carbon monoxide detectors: (1-4) .....$12.36 Each smoke detector over 4 .....$ 5.15 For inspection purposes smoke detectors may be grouped in a ratio of five (5) detectors to one (1) inspection provided that all detectors are ready for inspection at the same time and are located in the same structure. 7. Pool bonding .....$18.54 8. Pool pump (each) .....$12.36 9. Hydro massage tub .....$10.30 10. Hot tub or spa .....$14.42 11. Miscellaneous. Special circuits such as window air conditioners, baseboard heaters, rectifiers, motion pictures machinery, x-ray machines, special equipment, outdoor lighting or any circuits not already covered: .....$18.54 12. Dishwashers or trash compactor .....$ 6.18 13. Disposal/ceiling fan, vent hood, bath fan, exhaust fan (each) .....$ 6.18 14. Electric heat 1 to 15 kW .....$ 8.24 16 to 25 kW .....$15.45 Motor/no electric heat (gas-fired furnace) .....$ 6.18 15. Construction meter (owner or contractor) .....$28.84 16. Range .....$17.51 17. Dryer .....$17.51 18. Water heater .....$17.51 19. Sign .....$36.05 20. Investigation .....$46.35 21. Inspection (each) .....$25.75 22. Re-inspection (each) .....$45.35 c. Temporary power requirements. Before any power is supplied to the permanent distribution system of a building under construction, written notice must be submitted to this office noting the length of time the temporary power will be needed before the final electrical inspection is made, the understanding that the structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this section. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed thirty (30) days. An extension of time may be granted only be special permission. After release for connection to electrical service, if connection is not made within six (6) months, a new meter loop permit and inspection approval will be required before release. d. Expiration of permits shall be assessed as provided in subsection 8-31(c)(l)u. e. Minimum fee for permit for electrical work shall be fifty dollars ($50.00) f. Work with no permit. In case it shall be discovered that any electrical work has been installed or put into use for which no permit has been issued, the violator shall pay a fee equal to three (3) times the permit fee which shall have been paid for work done in violation thereof and no additional permits shall be granted until all fees have been paid. (3) Plumbing permit fees. a. New construction. 1. One- and two-family dwellings: Ten cents ($0.10) per square foot under roof. 2. All other occupancies: As set forth in the unit cost schedules in subsection 8-3 l(c)(3)b. b. Repair/alterations/addition to existing construction. 1. Unit costs-Each plumbing fixture outlet or appliance: .....$6.18 Shall include each water closet, urinal, bidet, sink, lavatory, basin, laundry sink, wash tray, beer or soda fountain, bath tub, hot tub, shower, sauna, drinking fountain, wet bar, washing machine, hose cabinet or hose rack, fire pump, sewer ejector, cooling tower, sill cock, dental unit, hub drain, floor, area or roof drain, sand trap, grease trap, sump pump or any other plumbing element commonly known as plumbing fixture. 2. Water service .....$30.90 3. Water housepiping .....$30.90 4. Water standpipe .....$30.90 5. Backflow prevention device .....$30.90 6. Sump .....$ 8.24 7. Swimming pool .....$14.42 8. Renew soil line .....$ 8.24 9. Renew gas vent .....$ 8.24 10. Gas housepiping .....$30.90 11. Additional opening .....$ 6.18 12. Floor furnace .....$17.51 13. Unit heater .....$17.51 14. Wall furnace .....$17.51 15. Commercial dryer .....$17.51 16. Commercial range .....$17.51 17. Water heater .....$17.51 18. Miscellaneous .....$17.51 19. Inspection .....$25.75 20. Investigative inspection (as per conditions of subsection 8-31 (c)(1)p.) .....$45.35 21. Re-inspections .....$45.35 c. Expiration of permits shall be addressed as per conditions of subsection 8-3 l(c)(l)u. d. Work located out of city limits shall be charged a surcharge of fifty (50) percent of total permit charge. e. Minimum fee for any permit for plumbing work shall be fifty dollars ($50.00). f. Work with no permit. The penalty for failure to obtain a permit for work as called for in city Code shall be as described in the penalty section of this Code, and in addition to any such fine or imprisonment as may be imposed pursuant to said penalty section, the violator shall pay a fee equal to three (3) times the permit fee that was paid for work done in violation hereof. (4) Heating/air mechanical permit fees. a. New construction. 1. One- and two-family dwelling: Eleven cents ($0.11) per square foot. 2. All other occupancies. As set forth in the cost schedules in subsection 8-31(c)(4)b. b. Commercial and residential replacements, repairs, alterations and additions. 1. Total Valuation | Mechanical fee schedule $500.00 and less | No fees, unless inspection required, in which case a Twenty-Five and 75/100 Dollars ($25.75) fee for each inspection shall be charged. $100.01 to $50,000.00 | Fifty-One 50/100 Dollars ($51.50) for the first two thousand dollars ($2,000.00) plus Six and 18/100 Dollars ($6.18) for each additional one thousand dollars ($1,000.00) or fraction thereof. $50,001.00 to $100,000.00 | Three Hundred Sixty and 50/100 Dollars ($360.50) for the first fifty thousand dollars ($50,000.00) plus Five and 92/100 Dollars ($5.92) for each additional one thousand dollars ($1,000.00) or fraction [thereof]. $100,001.00 to $500,000.00 | Six Hundred Fifty-Nine and 20/100 Dollars ($659.20) for the first one hundred thousand dollars ($100,000.00) plus Five and 66/100 Dollars ($5.66) for each additional one thousand dollars ($1,000.00) or fraction thereof. $500,001.00 and up | Two Thousand Nine Hundred Twenty-Five and 20/100 Dollars ($2,925.20) for the first five hundred thousand dollars ($500,000.00) plus Five and 15/100 Dollars ($5.15) for each additional one thousand dollars ($ 1,000.00) or fraction thereof. * Boiler permits are issued only with proof of special boiler license. 2. Inspection (each) .....$25.75 3. Re-inspection (each) .....$46.35 4. Investigative inspection (each) .....$46.35 c. Minimum fee for any heating/air or mechanical permit shall be fifty dollars ($50.00). d. Expiration of permits are addressed as per conditions of subsection 8-3 l(c)(l)u. e. Work located out of city limits shall be charged a surcharge of fifty (50) percent of total permit charge. f. Penalties (working without a permit). Where work for which a permit is required by the Arkansas Mechanical Code is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled; however, payment of such triple fee shall not relieve any person from fully complying with the requirements of the Arkansas Mechanical Code in the execution of the work nor from any penalties prescribed herein and no additional permits shall be granted until all fees have been paid.
(Ord. No. 15,391, §§ 1(I)(A), (I)(B), (I)(D)—(I)(K), (L), (O), 2, 12-9-87; Ord. No. 15,401, § 1, 12-15-87; Ord. No. 15,777, §§ 1(I)(A), (B), (D)—(K), (N)—(Q), 2, 11-7-89; Ord. No. 17,066, § 1, I. A., B., D.—K., N.—T., 12-26-95; Ord. No. 17,648, §§ 1, 2, 12-30-97; Ord. No. 18,086, § 1, 8-3-99; Ord. No. 18,551, § 1, 9-4-01; Ord. No. 18,617, §§ 1, 2, 12-18-01; Ord. No. 18,617, §§ 1, 2, 12-18-01; Ord. No. 19,458, §§ 1, 2, 12-13-05; Ord. No. 20,253, § 1, 4-20-10; Ord. No. 20,458, §§ 1, 2, 8-16-11; Ord. No. 20,971, §§ 4—6, 12-16-14; Ord. No. 20,972, § 1, 12-16-14; Ord. No. 21,677, § 1, 12-11-18; Ord. No. 22,204, § 1, 12-6-22; Ord. No. 22,703, § 1, 12-16-25)
Ask a question about Little Rock law
Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.
