R12-100.5 — Remediation Contracting
Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § R12-100.5
Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/e10a0b98-0a82-48d1-900b-0eccd7d46dd5
Sec. R12-100.5. Remediation Contracting.
The following activities are considered remediation contracting and are exempt: (1) Excavation, transportation, treatment, and/or disposal of contaminated soil for purposes of site remediation (rather than characterization); (2) Installation of groundwater extraction and/or injection wells for purposes of groundwater remediation; (3) Installation of pumps and piping into groundwater extraction wells for remediation purposes; (4) Installation of vapor extraction wells for the purpose of soil or groundwater remediation; (5) Construction of remediation systems, such as groundwater treatment plants, vapor extraction systems, or air injection systems; (6) Connection of remediation systems to utilities; (7) Abandonment of groundwater or vapor extraction wells; (8) Removal/demolition of remediation systems; (9) Capping/closure construction activities; and (10) Service or handling charges for subcontracted remediation contracting activities. (Ord. 2010-25, 9/7/2010, Reenacted (SUPP 2010-03))
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.
