§ 22.5-93 — Standards and requirements: Construction
Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 22.5-93
Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/e1d22203-2169-4f9c-987a-900a643a3420
Sec. 22.5-93. - Standards and requirements: Construction.
Construction IAQ Management Plan. Prior to the issuance of a building permit, a statement of the plans detailing the Construction IAQ Management actions to be implemented during the construction and pre-occupancy phases of the building shall be submitted to the city and shall include: (1) Construction IAQ Management plan that shall be based upon the recommended Control Measures of the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition 2007, ANSI/SMACNA 008-2008, Chapter 3; and (2) Proof that on-site or installed absorptive materials will be protected from moisture damage; and (3) If permanently installed air handlers are used during construction, proof that filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 will be used at each return air grille. In addition, all filtration media shall be replaced immediately prior to occupancy.
(Ord. No. 13080, § 2, 7-9-09)
Ask a question about Miami law
Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.
