Construction period for general aviation ground stations.
47 C.F.R. § 22.815
in effectEffective The construction period (see § 1.946 of this chapter) for general aviation ground stations is 12 months.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-47.xmlFetched: 7/26/2026
