For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 66-234 — Industrial pretreatment

Code of the Town of Gilbert, Arizona (Supp. No. 103: codified through Ordinance No. 2986, enacted June 9, 2026) · Gilbert Town Code § 66-234

Corpus is an independent public-information project, not the official City of Gilbert website. Stable reference: corpuslaw.us/code/e24f754d-e544-4fe7-86c3-a2c4f71aa729

Sec. 66-234. - Industrial pretreatment.

(a) Required. Pretreatment will be required in the following instances, and the director shall submit to the permit applicant the pretreatment levels which must be obtained: (1) If the director determines upon the initial application for a permit under this division that the proposed industrial waste must be pretreated by the applicant to lower the level of any of the components of the industrial waste discharge to the town sewer. (2) If the town must improve the discharge from its wastewater treatment plant, then, and in that event, the director shall require that a permit holder install or enlarge pretreatment facilities to lower the affected component of the permittee's industrial waste discharge. (3) If any wastewater prohibited under the conditions of this article is produced, such producer shall pretreat the wastewater to the extent required, to comply with the standards established in this division before discharging to any town sewer. (4) The acceptability of a pretreatment method for any given discharge, an application for which has been made in accordance with this division, and the terms for the installation and use thereof shall be reviewed by the director. Such a review shall be made on the basis of sound engineering and operational evaluations, taking into consideration all factors pertinent to the effect of the discharge, both before and after pretreatment on any part of the system. (5) Pretreatment facilities shall at all times be subject to inspection by the director or to a joint inspection by the director and the Cities of Phoenix or Mesa in order to determine if such facilities are efficiently performing the function for which they are installed or are in compliance with applicable pretreatment standards and requirements. (6) If the director determines that a permittee, because of plant expansion and/or changes in plant operations, has increased either the strength or volume of the discharge, the director may require additional pretreatment to lower the level of the volume and/or any components of the industrial waste before discharge, unless such permittee has previously made industrial cost recovery payments for reservation of additional industrial capacity. Pretreatment facilities required under subsection (a) of this section shall be provided, operated, and maintained at the permitholder's expense. The owner shall keep written records and documentation of all cleaning, repair, calibration, and maintenance required to demonstrate compliance with this section. Records shall be kept at the facility for a minimum of three years and be made available to the director upon request. (b) Disposal of sludge or other materials. Any sludge or other material removed from the industrial waste by the pretreatment facility shall be disposed of in accordance with applicable federal, state and local laws. (c) Dilution. Dilution or commingling as a partial or complete substitute for adequate treatment of waste discharged to the town sanitary sewer system is prohibited, whether accomplished by the combination of two or more wastestreams by a producer or producers, or by the addition of other liquids solely for the purpose of diluting the quality of the waste discharge. (d) Submission of plans for pretreatment facilities. Detailed plans showing any pretreatment facilities shall be submitted to the director for approval before construction of the facilities. The review of such plans will in no way relieve such permit holders from the responsibility of modifying and operating the facilities to produce an effluent complying with the established conditions of the permit and federal regulations. Any subsequent, significant changes in the approved facilities or method of operation shall be reported to the director and must be reviewed and approved by the director as complying with the provisions established in this section. Furthermore, all facilities, methods of operation and discharges must comply with the rules and regulations contained in 40 CFR 403 including, but not limited to, categorical pretreatment standards. (e) Approval; filing of pretreatment plant construction plans. After the construction plans for such pretreatment plants have been approved and a permit issued, the plans shall be placed on file in permanent, reproducible form with the director, without cost to the town, before a building permit will be issued. (f) Compliance of pretreatment facilities with director's demand to halt discharges. Pretreatment facilities shall comply with the demand of the director to immediately halt any actual or threatened discharge to the POTW when the director has given notice that such actual or threatened discharge of pollutants reasonably appears to present an imminent endangerment to the health or welfare of persons or which presents or may present an endangerment to the environment or threatens to interfere with the operations of the POTW. (g) It shall be unlawful for any person to tamper with, damage, or destroy any monitoring equipment with the knowledge or intention of altering the sampling analysis or readings or causing damage or destruction of the monitoring/sampling equipment being utilized to determine compliance with this article.

(Ord. No. 1612, § I, 12-14-04)

Ask a question about Gilbert law

Corpus searches the Gilbert sections it holds and shows the ones that match, with their citations. Free, no sign-in.