§ 33.510.253 — Greenway Overlay Zone in South Waterfront Subdistrict
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.510.253
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/e297df26-1c90-449d-a4cd-f072fb25a674
33.510.253 Greenway Overlay Zone in South Waterfront Subdistrict
A. Purpose. The regulations of this section: 1. Protect, conserve, enhance, and maintain the natural, scenic, historical, economic, and recreational qualities of lands along the Willamette River within the South Waterfront Subdistrict of the Central City plan district; 2. Increase public access to and along the Willamette River for the purpose of increasing recreational and transportation opportunities; 3. Support the development of the South Waterfront Subdistrict as a vibrant mixed-use neighborhood within the Central City plan district; 4. Ensure a clean and healthy river for fish, wildlife, and people; 5. Embrace the river as Portland’s front yard; 6. Enhance stormwater management in the South Waterfront Subdistrict; 7. Respond to the federal Endangered Species Act and Clean Water Act; and 8. Implement the Willamette Greenway Plan and State law. B. Relationship to other regulations. Development within the Greenway Overlay Zone in the South Waterfront Subdistrict is also subject to other regulations of the Portland City Code. Development within the Greenway Overlay Zone may also be subject to the regulations and review procedures of state and federal agencies including the Oregon division of State Lands, the National Marine fisheries Service, the US Army Corps of Engineers, and the Oregon Department of Fish and Wildlife. C. Where these regulations apply. The regulations of this section apply to sites within the South Waterfront Subdistrict where any portion of the site is in the Greenway Overlay Zone, shown on the Official Zoning Map. Figure 510-2 South Waterfront Greenway Area and Subareas


D. Required South Waterfront Greenway Setback Area improvements. Adjustments and modifications to this subsection are prohibited. 1. Required landscaping. a. When development on the site, or alterations to structures, the site, or rights-of- way are made, and PP&D determines that the value of the proposed alterations on the site is more than $366,300, the site must be brought into conformance with the landscape requirements of Paragraph E.5.g. that apply to subareas 2 and 3 of the South Waterfront Greenway Setback Area. The value of the alterations is based on the entire project, not individual building permits. It is the responsibility of the applicant to document the value of the required improvements. The following alterations and improvements do not count toward the dollar threshold of this subsection: (1) Alterations required by approved fire/life safety agreements; (2) Alterations related to the removal of existing architectural barriers to meet the Americans with Disabilities Act, or Chapter 11 of the Oregon Structural Specialty Code; (3) Alterations required by Chapter 24.85, Interim Seismic Design Requirements for Existing Buildings; (4) Improvements to on-site stormwater management facilities in conformance with Chapter 17.38, Drainage and Water Quality, and the Stormwater Management Manual; and (5) Improvements made to sites in order to comply with Chapter 21.35, Wellfield Protection Program, requirements. b. Caps on the cost of required landscaping. Required landscaping costing more than 10 percent of the value of the proposed alterations does not have to be installed. When all required landscaping is not being installed, the priority for which landscaping is to be installed is: (1) Trees in subarea 2; (2) Shrubs in subarea 2; (3) Ground cover in subarea 2; (4) Trees in subarea 3; (5) Shrubs in subarea 3; (6) Ground cover in subarea 3; and (7) Other required landscaping; c. Supplemental application requirement. Where landscaping is required by this paragraph, the applicant must submit a landscape plan to PP&D that shows that the landscaping will grow to meet the landscape standards of Subparagraph E.5.g, below, within five years. The landscape plan must be certified by a licensed landscape architect, or by a qualified restoration specialist as part of a formal City revegetation project under authority of Portland Parks and Recreation or the Bureau of Environmental Services. 2. Bank improvements. In subarea 1, when there is any regrading, bank stabilization, or other activities affecting the contours and composition of soil, the requirements of Paragraph E.5.g for subarea 1 must be met. 3. Major public trail and pedestrian connections and public viewpoints. When development on a site, or alterations to structures, the site, or rights-of-way are made that add more than 50,000 square feet of floor area to the site, the applicant must provide public access easements for, and construct, the major public trail, pedestrian connections to the major public trail, and public viewpoints in accordance with Subparagraph E.5.e., and Subparagraph E.5.f. The requirement to provide an access easement for, and construct, the major public trail, pedestrian connections, and public viewpoints applies only when the development described above will increase the use of the major public trail system or will contribute to the need for additional major public trail facilities, and application of the regulations is determined to be roughly proportional to the impacts of the proposed development. The square footage added to the site is calculated based on the total amount added, regardless of the amount demolished; 4. Timing of improvements. The applicant may choose one of the following options for making the improvements required by this subsection: a. Option 1. Under Option 1, required improvements must be made as part of the development or alteration that triggers the required improvements; b. Option 2. Under Option 2, the required improvements may be deferred if the following are met: (1) The applicant must provide the PP&D with a performance guarantee for the improvements. See 33.700.050, Performance guarantees; and (2) The required improvements must be constructed or installed within 4 years of issuance of the Certificate of Occupancy or within the timeline approved through a South Waterfront Greenway Review. See Chapter 33.851. 5. Landscaping monitoring and reporting. Monitoring required landscaping is the ongoing responsibility of the property owners. If landscaping is required by the subsection, the owner must submit a report to PP&D documenting that the landscape standards of Subparagraph E.5.g., below, have been met on the site. The report must be submitted within 1 year of the installation date, or within the timeline approved through a South Waterfront Greenway Review. See Chapter 33.851. E. Review thresholds and development standards. 1. Design review. Within the South Waterfront Greenway Setback Area show on Figure 510-2, new development, and changes to the land or structures including excavations and fills, bridges, and docks are subject to design review, unless exempted by Paragraph E.4. 2. South Waterfront greenway review. South Waterfront greenway review is required for the following: a. New development or exterior alterations that do not meet the standards of Paragraph E.5 b through E.5.i and are not exempted by Paragraph E.4. South Waterfront greenway review is not required for exterior alterations to nonconforming development in the South Waterfront Greenway Setback Area if the exterior alteration brings the site closer to conformance with the applicable standards in E.5; b. New development, or changes to the land or structures, riverward of top of bank, including excavations and fills, bridges, and docks, unless exempted by Paragraph E.4. 3. Adjustment review. An adjustment, or modification through design review, is required for new development or exterior alterations that do not meet the standards of Paragraph E.5.j and are not exempted by Paragraph E.4. 4. Exemptions. The following are exempt from this Subsection: a. Changes to the interior of a building; b. Normal maintenance and repair; c. Dredging, channel maintenance, and the removal of gravel from the river as follows: (1) Dredging, channel maintenance and the removal of material within the federal navigation channel. (2) Dredging, channel maintenance, and the removal of materials outside the federal navigation channel as follows: • Dredging and the removal of materials in waters that are 35 feet deep or deeper, measured from the ordinary high water mark; or • Channel, slip and berth maintenance that has been approved by the U.S. Army Corps of Engineers. (3) The placement of dredged materials within the River General overlay zone is not exempt. d. Emergency procedures necessary for safety or the protection of property. e. Development of public streets identified in the adopted South Waterfront District Street Plan, Criteria and Standards are exempt from design review, but not greenway review. f. Planting of native vegetation listed on the Portland Plant List when planted with hand-held equipment or equipment with a wheel surface-to-ground pressure of no more than 7.5 psi. g. Tree removal as follows. Trees removed must be replaced as shown in Table 510- 1. (1) Trees on the Nuisance Plants List; (2) Dead, dying or dangerous trees or portions of trees when they pose an immediate danger, as determined by the City Forester or certified arborist; (3) Trees that exceed the height restriction of a view corridor within special height restrictions designated in the Central City Scenic Resources Protection Plan; or (4) In addition to the trees listed above, up to a combined total diameter of 50 inches of non-native, non-nuisance trees. 5. Development standards. a. Where these standards apply: (1) Standards E.5.b through E.5.h apply in the South Waterfront Greenway Setback Area shown on Figure 510-2. South Waterfront greenway review is required for proposals that do not meet the standards. Adjustments to standards E.5.b through E.5.h are prohibited. (2) The standards in E.5.i apply within the combined flood hazard area and within the South Waterfront Greenway Setback Area shown on Figure 510- 2. South Waterfront greenway review is required for proposals that do not meet the standards. Adjustments to the standards in E.5.i are prohibited. (3) The standards in E.5.j apply within the River General overlay zone. Adjustments or modifications through design review are allowed for the standards in E.5.j. b. Non-landscaped area. Limiting the percentage of non-landscaped area allowed in the South Waterfront Greenway Setback Area ensures that the area will be configured to accommodate a minimum percentage of living plant cover. Non- landscaped area includes all aboveground structures and paving materials, including permeable paving materials. (1) Subareas 1 and 2. Up to 20 percent of the portion of the site in subareas 1 and 2 may be covered by non-landscaped area; however, paved surfaces that are required under the provisions of Paragraph E.5.f., Public viewpoints, are exempt from this limitation. Non-landscaped area may be no closer than 10 feet of the top of bank line as shown on Map 510-21, South Waterfront 2002 Top of Bank Line; (2) Subarea 3. Up to 20 percent of the portion of the site in subarea 3 may be covered by non-landscaped area. However, required trail and pedestrian connection improvements are exempt from this limitation. c. Buildings. Buildings are allowed within the South Waterfront Greenway Setback Area if they meet E.5.c.(1) and (2) and either E.5.c.(3) or (4). Other buildings or portions of buildings are not allowed within the South Waterfront Greenway Setback Area. Alterations to nonconforming buildings are allowed provided the building and any projections are not expanded within the South Waterfront Greenway Setback Area. (1) The site meets the non-landscaped area requirements under E.5.b., above; and (2) The building does not obstruct required pedestrian connections and trails; and (3) The building is river-dependent or river related; or (4) All of the floor area of the building is in Retail Sales And Service uses and the following are met: • The building has less than 1,000 square feet of floor area; • The building is entirely within subarea 3 and not located within the combined flood hazard area; and • The building is located landward of the South Waterfront recreational trail. d. Fences and walls. Fences and walls are allowed in subarea 3 of the South Waterfront Greenway Setback Area if they are no more than 3 feet in height and do not obstruct the required pedestrian connections and trails. Fences and walls are not allowed in subareas 1 and 2 of the South Waterfront Greenway Setback Area. e. Major public trails and pedestrian connections. (1) Purpose. Major public trails provide public access to and along both sides of the Willamette River. Major public trails are one of the tools used to comply with the public access requirements of the Comprehensive Plan and the Willamette Greenway Plan. Pedestrian connections ensure that there is adequate, safe, and direct pedestrian access from the adjacent development and from the district as a whole to the major public trails. (2) Major public trails. Major public trails must meet the following standards. When required by Subsection D., sites with major public trail symbol shown on the Official Zoning Maps must provide easements that would accommodate construction, maintenance, and public use of a major public trail that meets the following standards. See Figure 510-3. • Location. The major public trail must be located in the South Waterfront Greenway Setback Area shown on Figure 510-2. All portions of the major public trail must be at least 10 feet and no more than 75 feet from the top of bank line as shown on Map 510-21, South Waterfront 2002 Top of Bank Line; however, any portion of the major public trail that is within 45 feet of the top of bank line as shown on Map 510-21, South Waterfront 2002 Top of Bank Line, is subject to the maximum non-landscaped area limitations of Subparagraph E.5.b.; • Width. The major public trail must consist of two paths, each at least 12 feet in width; • Landscaped median. The two paths must be separated by a landscaped median at least 6 feet wide. Landscaping within this median must meet the requirements of Paragraph E.5.f. The landscaping may be interrupted by public access connections between the two paths; • Use. The path closest to the river must be designated for pedestrians only. The path farthest from the river must be designated for bicycles and other non-motorized transportation modes; • Connectivity. – The major public trail or major public trail easement must connect to the existing major public trails or trail easements on adjacent sites; and – The major public trail or major public trail easement must connect to the required pedestrian circulation system on the site. • Additional standards. In addition to the standards of this subparagraph, the standards of Chapter 33.272, Major Public Trails, must also be met. (3) Pedestrian connections. When a major public trail or major public trail easement is required, at least one pedestrian connection must be provided between the trail easement and any accessway that terminates on the site. Figure 510-3 South Waterfront Greenway Trail


f. Public viewpoints. (1) Purpose. Public viewpoints provide stopping places and clearings along the South Waterfront Greenway trail and the Willamette River where the public can view and enjoy the natural and scenic qualities of the Greenway and the river. Public viewpoints are one of the tools used to comply with the public access requirements of the Comprehensive Plan and the Willamette Greenway Plan. (2) Viewpoint requirements. A public viewpoint must be provided on sites designated in the Central City Scenic Resources Protection Plan. • Sites with a viewpoint designation must provide a viewpoint area that meets the following standards: – The viewpoint area must be at least 500 square feet in area; – The viewpoint area must abut the Greenway trail or a public access connection must be provided from the Greenway trail to the viewpoint area; – The viewpoint area and any public access connection to the viewpoint area from the Greenway trail must comply with the Use of Trail, Hours of Use, Trespass, and Trail Maintenance and Liability sections of Chapter 33.272, Major Public Trails; – Materials, benches, and lighting used in the viewpoint area must meet the requirements of the Portland Bureau of Parks and Recreation; and – If an accessway or street that is mapped as a special building height corridor on Map 510-15 terminates on the site, the view corridor must continue the projected centerline of the accessway or street as shown in Figure 510-4. g. Landscaping. (1) Coverage. Eighty (80) percent of the area that is not covered by buildings, trails, or other allowed non-landscaped area must be covered by shrubs or ground cover, and all trees required by this paragraph must be installed in the ground and healthy; (2) Existing landscaping. Existing plants may be used to meet the standards of this paragraph, if protected and maintained during construction as specified in Section 33.248.040. However, plants identified in the South Waterfront Greenway Nuisance Plants List of the Portland Plant List must be removed. Figure 510-4 Public Viewpoint and View Corridor


(3) Required landscaping in subarea 1. In subarea 1, the area beginning 3 feet above the ordinary low water line must meet the following requirements: • Shrubs. At least 80 percent of the required landscaped area must be planted in shrubs; • Trees. Trees are not required, but are allowed; • Ground cover. All of the required landscaped area that is not planted with shrubs or trees must be fully covered with ground cover plants; • Plant list. Only plants listed in the South Waterfront Greenway Subarea 1 Plant list of the Portland Plant List may be planted; and • Installation of landscaping. All planting must be of a sufficient size and number to meet the coverage standards within five years. Restoration size plant material, including bare-root, is allowed and recommended. Planting is not required to meet the size and spacing requirements of 33.248.030, Plant Materials. Planting is not allowed during the summer. (4) Required landscaping in subarea 2. In subarea 2 the required landscaping is: • Shrubs. At least 80 percent of the landscaped area must be planted in shrubs; • Trees. At least one tree must be planted for every 400 square feet of landscaped area. Trees may be clustered; • Ground cover. All of the landscaped area that is not planted with shrubs or trees must be fully covered with ground cover plants; • Plant list. Only plants listed in the South Waterfront Greenway Subarea 2 and 3 Plant List of the Portland Plant List may be planted. At least eight different species must be planted; and • Installation of landscaping. All planting must be of a sufficient size and number to meet the coverage standards within 5 years. Planting is not required to meet the size and spacing requirements of 33.248.030, Plant Materials. (5) Required landscaping in subarea 3. In subarea 3, the required landscaping is: • Shrubs. At least 60 percent of the landscaped area must be planted in shrubs. At least 50 percent of the shrubs used to meet this requirement must be listed in the South Waterfront Greenway Subarea 2 and 3 Plant List of the Portland Plant List; • Trees. At least 1 tree must be planted for every 1,000 square feet of landscaped area. At least 50 percent of the trees used to meet this requirement must be listed in the South Waterfront Greenway Subarea 2 and 3 Plant List of the Portland Plant List; • Ground cover. All of the landscaped area that is not planted with shrubs or trees must be fully covered with ground cover plants. At least 50 percent of the ground cover plants must be listed in the South Waterfront Greenway Subarea 2 and 3 Plant List of the Portland Plant List; • Plant list. Except as allowed by (1), (2) and (3), only plants listed in the South Waterfront Greenway Subarea 2 and 3 Plant List of the Portland Plant List may be planted. The following plants are prohibited: – Plants included on the Nuisance Plants List or Required Eradication List of the Portland Plant List; – Plants included in the South Waterfront Greenway Nuisance Plants List of the Portland Plant List. • Installation of landscaping. All planting must be of a sufficient size and number to meet the coverage standards within five years. Planting is not required to meet the size and spacing requirements of 33.248.030, Plant Materials. h. Other development. Other development is allowed within the South Waterfront Greenway Setback Area if it meets E.5.h.(1) and (2) and either E.5.h.(3) or (4). (1) The site meets the non-landscaped area requirements under E.5.b; (2) The development does not obstruct required pedestrian connections and trails; and (3) The development is located in subarea 3; or (4) The development is river-dependent or river-related. i. Trees. (1) Trees must be preserved except as follows: • Trees on the Nuisance Plants List may be removed; • Trees located within 10 feet of existing or proposed buildings and structures attached to buildings may be removed; • Trees that exceed the height restriction of a view corridor within special height restrictions designated in the Central City Scenic Resources Protection Plan may be removed; • Dead, dying or dangerous trees or portions of trees when they pose an immediate danger, as determined by the City Forester or certified arborist may be removed; and • In addition to the trees listed above, up to 50 inches of non-native, non- nuisance trees may be removed. (2) Trees removed within the South Waterfront Greenway Setback Area that are 1.5 inches in diameter or greater and trees located in the combined flood hazard area landward of the South Waterfront Greenway Setback Area that are 3 inches in diameter or greater must be replaced as shown in Table 510-1. (3) Replacement trees must meet the following: • Replacement trees must be a minimum ½-inch caliper, bareroot or live stakes, unless they are oak or madrone, which may be one gallon size. No more than ten percent of the trees may be oak or madrone. Shrubs must be a minimum of one gallon size or bareroot. All other species must be a minimum of four-inch pots or equivalent; and • Replacement trees must not be planted within a view corridor. Planting to replace trees removed from the combined flood hazard area must be within the combined flood hazard area. If the vegetation is not planted on the applicant’s site, then the applicant must own the property or possess a legal instrument, such as an easement or deed restriction, that is approved by the City as sufficient to ensure the right to carry out, monitor, and maintain the mitigation. (4) The requirements of Section 33.248.090, Mitigation and Restoration Planting must be met. (5) All vegetation removal activities must be surrounded or protected to prevent erosion and sediment from leaving the site or negatively impacting resources on the site. (6) Temporary disturbance area must be replanted to meet the subarea 3 standards in 33.510.253.F.2.f.(5). Table 510-1 Tree Replacement in the South Waterfront Greenway Overlay Zone

j. Exterior lighting. (1) Purpose. The standards for exterior lighting are intended to: • Avoid or minimize light glare and light spill from artificial lighting and associated negative impacts on fish and wildlife and their habitats; • Reduce light pollution and glare impacts on residential developments; • Maintain public safety and security along the major public trail, pedestrian connections to the major public trail, in parks, along public streets, and on piers and gangways; and • Provide flexibility for river dependent operations associated with docks. (2) General standards. The following standards apply to all exterior lights. • Exterior lights must not project light upward or to the side of the fixture; and • The top and sides of all exterior light fixtures must be shielded with 100 percent opaque materials; and • Lamps much fall below 3000K or within an S/P ratio range of 1 to 1.2. (3) Additional standards for areas near the Willamette River. The following standards apply to all permanent exterior lights located within and riverward of the greenway setback, and all permanent exterior lights located within 25 feet landward of the greenway setback. Exterior lights within public rights-of-way are exempt from this Subsubparagraph. • Exterior lights are allowed only if the lights are for the following use or development: – Park and Open Area uses; – The major public trail or pedestrian connections to the major public trail; – Public viewing areas; or – River-dependent or river-related development. • Structures that support exterior light fixtures must be setback at least 5 feet from the top of bank of the Willamette River except for docks and gangways, and must be setback at least 30 feet from any other stream, drainageway, wetland or water body; • Structures that support exterior light fixtures must be spaced at least 25 feet apart; • Exterior lights must not project directly into the Willamette River. F. Greenway goal exception. Approval of an exception to Statewide Planning Goal 15, Willamette Greenway, is required to locate development or a right-of-way that is not river- dependent or river-related within 25 feet of the top of bank. A greenway goal exception is not required to add revetments to a riverbank. The approval criteria are in Section 33.840.200, Greenway Goal Exception.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
