For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.654.130 — Additional Standards for Rights-of-Way

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.654.130

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/e2fd1839-302e-4fc8-bdbc-68a71267abea

33.654.130 Additional Standards for Rights-of-Way

A. Street trees. 1. For existing and proposed public streets, the City Forester, in consultation with the City Engineer, has preliminarily approved the street tree preservation, protection, and planting plan. 2. Private street trees. Private street tree plans must meet the standard stated in Subparagraph A.2.a. If the proposal cannot meet the standard, the applicant can choose to meet the approval criterion in Subparagraph A.2.b. Adjustments are prohibited: a. Private street tree standard. The street tree planting plan meets the Trees and Landscaping standards stated in the Permanent Administrative Rules for Private Rights of Way; b. Private street tree approval criteria. The number of private street trees may be reduced or are not required when: (1) It is not feasible to provide street trees while meeting 33.654.120 Design of Rights Of Way, and the minimum lot size and dimension standards of the zone; (2) Trees will be planted in the front yard of each lot, near the street tract, generally one tree every 25 feet of frontage; (3) The proposed tree locations will not conflict with public utility easements on the lots; and (4) Tree planting may be deferred until development of the lots, however, such planting must occur prior to final building inspection. B. Utilities. Telephone, cable, natural gas, electric, and telecommunication utilities must be located within rights-of-way or utility easements that are adjacent to rights-of-way. Utility easements up to 15 feet in width may be required adjacent to rights-of-way. Utility easements needed to serve the lots must be identified during the preliminary land division plan review.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.