33.475.500 Removal or Remediation of Hazardous Substances

A. General. The following regulations are substantive requirements that apply to actions taken to remove or remediate hazardous substances. All of the regulations must be met unless one or more are demonstrated to be impracticable pursuant to subsection G, below. B. Where these regulations apply. The regulations of this section apply to the portion of the site located within the boundaries of the removal or remediation action. C. Review procedure. 1. Except as described in Paragraph C.2., compliance with these regulations is processed through a Type II procedure. 2. If the action to remove or remediate hazardous substances is subject to this Code but exempt from procedural requirements, the action must comply with the substantive requirements of these regulations to the extent required under state or federal law and the person performing the action must notify the City that the action is exempt. A person conducting a cleanup otherwise exempted from the procedural requirements may choose to obtain a permit. D. Relationship to other regulations in this chapter. Actions to remove or remediate hazardous substances that are approved or selected under Oregon or federal cleanup law are exempt from the procedural requirements of Chapter 33.475. Any part of an action that is not in itself a remedial or removal action must meet all other applicable regulations and procedural requirements of this chapter. E. Regulations that apply to actions to remove or remediate hazardous substances. The following regulations apply to proposals for the removal or remediation of hazardous substances: 1. The removal or remedial actions and the final remedy must not preclude the use of the site consistent with the uses allowed by the base zone or an approved conditional use. If the site is within the River Industrial overlay zone or riverward of the river setback, the final remedy must allow the use of the site for river-dependent or river- related activities unless the site is found to be unsuitable for river-dependent or river- related uses. Generally, this means that the final remedy must allow development of major public trails, dredging necessary to establish or maintain navigation to and from riverfront sites, the placement of piles or dolphins, or the development of a marine facility, dock, or wharf or other river-dependent or river-related structure; 2. Buildings, structures and equipment required as part of removal or remediation actions must be located and designed taking into account the purpose of the river setback standard which is to keep structures at least 50 feet away from the top of bank of the river, reserve space for public access to the river and development of major public trails, and allow for natural resource enhancement (top of bank is shown on Map 475-2); and 3. Water quality treatment facilities must be located outside of the River Environmental overlay zone. F. Regulations that apply to actions to remove or remediate hazardous substances that occur in specific areas. The following regulations apply to actions within the River Environmental overlay zone to remove or remediate hazardous substances based on specific locations: 1. The following regulations apply to areas landward of the top of bank (top of bank is shown on Map 475-2): a. Disturbance of the ground and removal of native vegetation must be avoided outside of the actual soil removal areas. If avoiding disturbance or native vegetation removal is not practicable, disturbance and removal must be minimized. b. Where ground disturbance or removal of native vegetation cannot be avoided, the area must be replanted. The replanting standards are as follows: (1) Nuisance and prohibited plants identified on the Portland Plant List must be removed within the area to be replanted and within 10 feet of any plantings; (2) Planting density. The replanting area must meet one of the following plant and planting density standards specified in Table 475-8. Trees may be clustered. Trees must not be planted within a view corridor designated in the Central City Scenic Resources Protection Plan or River Plan / South Reach Scenic Resources Protection Plan. Table 475-8 Planting Density

![](https://figures.74-208-44-221.nip.io/portland/20261114/171bf53ddb124ccde4e59b7a51a6d8724855d68c07a79c02b8e71f65e56fa8c7.png)

[1] Tree size is based on Title 11.60.020.C Canopy Size (3) Plant diversity. For planting areas over 600 square feet, at least two different tree species and sizes, three different shrub species, and four different groundcover species are used; (4) Plant size. Trees must be a minimum ½-inch caliper or bareroot unless they are oak or madrone, which may be one gallon size. No more than ten percent of the trees may be oak or madrone. Shrubs must be a minimum of one gallon size or bareroot. All other species must be a minimum of four- inch pots or equivalent; and (5) The requirements of Section 33.248.090, Mitigation and Restoration Planting must be met. c. Tree replacement. Trees that are 1.5 inches or greater in diameter that are removed must be replaced based on Table 475-9: Table 475-9 Tree Replacement in Hazardous Substance Cleanup Sites

![](https://figures.74-208-44-221.nip.io/portland/20261114/946cda18781b38fb43e94d199b4a40b8cc8a0e1524a291ced50757596d8f2798.png)

(1) Size. The replacement trees must be a minimum ½-inch diameter or bareroot unless they are oak or madrone, which may be one gallon size. Shrubs must be a minimum of one gallon size or bareroot. All other species must be a minimum of four-inch pots or equivalent. (2) Type. The replacement trees must be native trees selected from the Portland Plant List; (3) Location. All replacement trees must be planted within the River Environmental overlay zone, within 50 feet of the River Environmental overlay zone, or within 50 feet of the top of bank of the Willamette River in the River Environmental overlay zone. See Map 475-2. If the project site is located in the combined flood hazard area, the plantings must also be within the combined flood hazard area. The person conducting the cleanup must own the property where the trees are planted or possess a legal instrument, such as an easement or deed restriction, that is approved by the City as sufficient to ensure the right to carry out, monitor, and maintain the plantings; and (4) Replacement trees can be counted toward meeting the requirements of subsubparagraph F.1.b(2). d. All vehicle areas and construction staging areas installed for purposes of conducting the removal and remediation actions must be removed from the River Environmental overlay zone when they are no longer necessary for remedy construction. All such areas must be removed by the time the project is complete and the areas must be replanted according to the standards of subparagraph F.1.b, above. 2. The following regulations apply to the area between the top of bank and the ordinary high water mark: a. When there is an alteration to the area between top of bank and the ordinary high water mark that is greater than 500 square feet or includes more than 50 cubic yards or excavation or fill, changes the ground contours, results in the removal of buildings, requires engineering of the river bank or includes in-water work, the following should be met (top of bank is shown on Map 475-2): (1) The area between the top of bank and the ordinary high water mark where the alteration occurs must be designed using biotechnical techniques including soil bioengineering (top of bank is shown on Map 475-2). Figures 475-7 and 475-8 show examples of biotechnical techniques. In addition to using biotechnical techniques, the following requirements apply: • Rock armoring or other hard surface armoring methods must not be used between the top of bank and the Ordinary High Water Mark except as needed surrounding outfalls. This is not intended to preclude using rock or other hard surface stabilization methods below the surface if necessary to contain hazardous substances or to preclude the use of rocks or gravel as part of the biotechnical technique; • The bank must be sloped or terraced in a way that allows the establishment and maintenance of vegetation as the primary soil stabilization method; • If the site is currently used for public recreation, including access to a beach or the river, the bank must be sloped or terraced in a way that allows for at least one public access way to the beach or river; • Large wood, including root wads, tree boles and logs, must be used to reduce localized erosion, improve bank stabilization, and improve ecological values and, if the site is currently used for public recreation, support continued use of beaches and the river; and • At least eighty percent of the area between the top of bank and the ordinary high water mark that is being altered as a result of the remedy must be planted with shrubs. At least one tree must be planted for every 400 square feet of altered area. All of the area that is not planted with shrubs or trees must be fully covered with ground cover plants. All plants must be selected from the Portland Plant List and should be appropriate for the conditions on the site. The requirements of Section 33.248.090, Mitigation and Restoration Planting must be met. (2) If biotechnical techniques are not practicable, as described in 33.475.500.G, and rock armoring is used on the surface between the top of bank and the Ordinary High Water Mark, then the slope of the bank must be shallow enough to allow a combination of rock and vegetation. See Map 475-2. At a minimum, live native willow or dogwood stakes should be planted in adequate soil, in the interstices between the rocks at a ratio of three stakes for every square yard of rock armoring. b. When there is a minor alteration of less than 500 square feet or less than 50 cubic yards of excavation or fill to the area between the top of bank and the ordinary high water mark, the regulations of paragraph G.1, above apply. See Map 475-2. 3. In the area that is riverward of the Ordinary High Water Mark, the following apply: a. Avoid in-water permanent structures that will impact the navigation channel or will preclude river-dependent or river-related development from accessing and utilizing the river for public recreation, transportation, tourism, or the transport, transfer and conveyance of goods and materials to and from the upland site; b. Integrate large wood, or other natural wave deflection structures or techniques that mimic the function of large wood, into the near-shore environment. Rock armoring, chemically treated wood, articulated block, and industrial debris is discouraged; c. If the area is a beach or is a shallow water depositional area, then the final design should include all of the following: (1) At least six inches depth of substrate that is ½-inch rounded gravel or smaller in size should be placed over capping material; (2) The submerged slope should be no steeper than 1:7 (rise to run ratio); and (3) Public access from major public trails or abutting upland sites to the river should not be precluded. d. If the area is not a beach or is not a shallow water depositional area, then the final substrate should be rounded rock no larger than 6 inches (D100=6”) with an average gradation size of 3 inches (D50=3”). Angular rock is discouraged. G. Demonstration of Impracticability. A person conducting a cleanup may be exempted from compliance with any requirement in this section if the person demonstrates that compliance with the requirement is not capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project remedial purposes. The person must still comply with that requirement to the extent practicable and remains subject to all other applicable requirements. To demonstrate impracticability the applicant must submit an engineering analysis, a cost schedule and any other information, such as desired future use of the site, that supports a demonstration that a requirement cannot be fully met. Figure 475-7 Example 1: Upland and In-Water Contamination Cleanup

![Figure 475-7 Example 1: Upland and In-Water Contamination Cleanup](https://figures.74-208-44-221.nip.io/portland/20261114/510d10fa5b7b943d0e9b4ff2dbdfb3c384840ca0297f9f4d92f7ef68a47a9e49.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/2a5eb64f116c27b055d0b69cbd6601af9ad53b2d4918d8b867f5839d88f064cb.png)

Figure 475-8 Example 2: In-Water Contamination Cleanup

![](https://figures.74-208-44-221.nip.io/portland/20261114/f4f784076c7d3c56210f2d0578a3023184e2a13ef814f785cf9b3ed5dfe66f6d.png)

![Figure 475-8 Example 2: In-Water Contamination Cleanup](https://figures.74-208-44-221.nip.io/portland/20261114/8cadb52f53d4af70af16e87be3cebb8f5fc44336a9002dfee9f0854830fa0758.png)

(Added by: Ord. No. 189000, effective 7/9/18. Amended by: Ord. No. 190023, effective 8/10/20; Ord. No. 190241, effective 3/1/21; Ord. No. 190851, effective 6/30/22; Ord. No. 190834, effective 10/1/22; Ord. No. 191310, effective 6/30/23; Ord. No. 191477, effective 3/1/24; Ord. No. 191477, effective 10/1/24; Ord. No. 191779, effective 10/1/24; Ord. 192152, effective 7/1/2026; Ord. 192213, effective 11/1/26.) The City of Portland is committed to providing meaningful access. To request translation, interpretation, modifications, accommodations, or other auxiliary aids or services, contact 311, Relay: 711. 503-823-4000: Traducción e Interpretación | Biên Dịch và Thông Dịch | अनुवादन तथा व्याख्या 口笔译服务 | Устный и письменный перевод | Turjumaad iyo Fasiraad Письмовий і усний переклад | Traducere și interpretariat | Chiaku me Awewen Kapas www.portland.gov/bps/accommodation

![](https://figures.74-208-44-221.nip.io/portland/20261114/6564b7d3a02f9e1b4ace2a4807118b33b302f6228ce0366f4966869638abf554.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/ce2ca04575278ef6c44e58070630e5098566d12fb9834c4c507055c32bd9ecd2.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/198c347defa77e2e45a6cf5fd0340fd96daa457bde9d1681eeb86efcbb91c663.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/3b62fe9d491afb6cb1e4e7f4ffc2696551171dc63553162452c25fd9af0b42ad.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/ea1287930282f2d79c88635ff52093df77d151b189dc386c3160cfb2f1a05e9e.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/8677ddbc39f00c3d076abd5535de970d0e5a778eccee2e7068988ef01239fe69.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/d8d5735af06680b1d17c5411838749dc326d51cfc80011832b15c87e3fcf18f7.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/14c34fea72976b7a1a220f8a0a32d133cf5245af20bcd3937fdf4f6299ad1c45.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/9c268af87767f18ddfd7bfc9cc4b185102945fc4d5edd438897197022f8495a5.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/ed7c58213af97af11a6b6a4de9ade860d07fc30e2a2f6e60d6dbaa2186cb58d7.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/5f7f6129557aac65038295947f3f5a0102c99a378ca2e783f007c25ceac77d58.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/198361c4233508101f580164c07c9970536bdd7fba2029f43d084484d1f3b884.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/cc1a09ec659875c34d63285eb40dfcac1d8dda66bfe27df0a6b1f481adbaedfb.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/8d9f95f673d28399ca344b89c8b231fa5e2bd3c6045a7b7e209b0d4ffd1125e9.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/61c74e7544b04374050b785063e39b82d5f579817209c8df605fa381bd74a545.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/5e06b4d513ba59f29d85203bebb0c249549b15c8d36bc88976893f1b4e3be7d1.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/c9d12fd3a2e576749f10fec11405d43c6a443d2dbe50fa5e08f703f651695b11.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/e19a357e8528dc52eeb59b9da124b2b06d81ba617872d9f14a3874c740fd93a9.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/9aee3eab739041bdcfe936f406d3d841194b25b9cb627bec8b85c7975ed48c47.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/1db174f1dc0f1038307ed5ba9242806355f487fa4027615e22cce8bc5647280e.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/482a5e590e8967c24fee59d6eb503119168701de71f6b1b8481a4fe4abc03bc8.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/2dc478dae9961608095bdce05f91217cc1238996f7225c66aef95676ad25f2f8.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/061fb81f820176ac76a41c78f2b390ea9cdae8d2938ddca68c037f5581e90ee2.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/12f19a67cd59a6a20f2670293dec3606edaa8d651bbc7e641c07a7740cbbe44c.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/fb20308d2439d1ede0e32d8e6ae60a0e1439105a7db9e62958f5e043271a492c.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/4ac77917b1af932ba6e8883d5715c07b98e19e9a89adb57f10ae284b09540422.png)

![](https://figures.74-208-44-221.nip.io/portland/20261114/e31a7aed6b2c688c8f2f1e8b4aec3e818ffd239d9fa0140f1e5e47a93661355b.png)

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.