§ 15.51.050 — Notice of violation
Revised Code of the City of Saint Louis, 2020, Annotated (Supp. No. 11: codified through Ordinance No. 72042, enacted October 30, 2025) · St. Louis Revised Code § 15.51.050
Corpus is an independent public-information project, not the official City of St. Louis website. Stable reference: corpuslaw.us/code/e32a8492-9f1d-4af6-9d2a-575435bd7b1b
15.51.050 - Notice of violation.
Whenever the Health Commissioner determines that a violation of any provision of this Code exists, he shall issue a written notification to the person responsible for the alleged violation. The notification shall set forth the nature of the violation and shall direct that the violation must be abated within the time period specified by the Health Commissioner, which time period shall not exceed sixty (60) days from the date the notice is sent; provided, however, if the violation cannot be abated within the time period specified, the Health Commissioner may extend the time period for compliance for a reasonable period of time upon submission of an acceptable abatement plan by the person responsible for the violation. In determining whether the abatement plan is acceptable, the Health Commissioner's consideration shall include, but shall not be limited to: A. The sufficiency of all construction plans to reduce noise or vibration levels; and B. The sufficiency of the design criteria for any equipment changes to reduce noise or vibration levels; and C. The length of time necessary to perform all work to abate the violation.
(1994 C., § 15.51.050; Ord. No. 68130, § 6, 10-26-2008; Ord. No. 64566, § 5, 1998.)
Ask a question about St. Louis law
Corpus searches the St. Louis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
