Master Sign Program Overlay Zone (MSP).
Milwaukee Code of Ordinances § 295-1017
in effect295-1017. Master Sign Program Overlay Zone (MSP).
1. PURPOSE. This overlay zone allows the use of different sign regulations in place of or in addition to the sign regulations of the base zoning district for the purpose of allowing overall flexibility in the application of sign regulations for larger, multi-tenant sites that may front on more than one street or have large street frontages, yet encouraging consistency of sign design within the overlay zone.
2. PROCEDURES. a. Creation. Creation of a master sign program overlay zone shall be by amendment to the zoning map, pursuant to s. 295-307.
b. Zoning Map Designator. Each master sign program overlay zone shall be shown on the zoning map by an “MSP” designator and an appropriate number.
c. Minimum Site Size. The minimum site size for application of the master sign program overlay zone shall be 1.5 acres.
d. Limitation on Permit Issuance. Permits may be issued for signs in an area covered by an approved master sign program only if such signs conform to the standards of the program.
e. Standards. Along with the application for creation of a master sign program overlay zone, the applicant shall submit a master sign program for review and approval by the common council at the same time the map amendment is adopted. The master sign program shall include the following:
e-1. A site plan, drawn to scale, delineating the area proposed for inclusion within the master sign program and the general location of all proposed signs.
e-2. Scale drawings or sketches indicating the location and characteristics of all existing signs.
e-3. Scale drawings or sketches indicating exterior surface details of all buildings on the site on which wall signs, directory signs, freestanding signs or projecting signs are proposed.
e-4. A graphic and written program specifying sign standards, including color, size, construction details, illumination and placement.
e-5. A statement of the reasons for any requested deviations from the standards or regulations of the base zoning district.
f. Allowable Deviations. A master sign program may include more than one freestanding sign per site or other deviations from the standards of this section, such as but not limited to the maximum size or height of individual signs, provided the master sign program meets the intent of the provisions of this section.
g. Required Findings. No master sign program shall be approved unless the commission finds all of the following to be true:
g-1. The design quality of the site and surrounding area will be greater with the master sign program than with application of the regulations and standards of this chapter.
g-2. The proposed signs are compatible with the style or character of other existing or proposed improvements on the site and with one another.
g-3. The proposed sign program will accommodate the signage needs of both current and future occupants of the site.
g-4. The site contains at least 1.5 acres, has multiple tenants and either fronts on more than one street or has a large street frontage.
g-5. The proposed master sign program meets the intent of the sign standards of the base zoning district.
h. Conditions of Approval. In approving a master sign program, the commission may impose, upon the applicant and the site to which the program would apply, any reasonable conditions necessary to carry out the intent of this subsection while still providing each sign user with opportunities for effective identification and communication.
i. Amendment of Zone Boundaries. Amendment of the boundaries of a master sign program overlay zone shall only be initiated by a motion of the common council or by a petition submitted to the common council and signed by owners of 50% or more of the area of all land included in the zone. Following passage of the common council motion or the department’s receipt of a petition, the proposed boundary amendment shall be considered by the plan commission and common council in accordance with the zoning map amendment procedure in s. 295-307-3.
Source: City of Milwaukee Legislative Reference Bureau, Milwaukee City Charter and Code of Ordinances (city.milwaukee.gov master PDFs)URL: https://city.milwaukee.gov/ImageLibrary/Groups/ccClerk/Ordinances/Volume-2/CH295-sub10.pdf#page=11Fetched: 10/26/2026