For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.465.240 — Supplemental Application Requirements

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.465.240

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/e3f213d2-4ae5-4bcd-9336-2fec83677438

33.465.240 Supplemental Application Requirements

In addition to the application requirements of Section 33.730.060, the following information is required for a Pleasant Valley resource review application: A. Supplemental site plan requirements. One copy of each plan must be at a scale of at last one inch to 100 feet. Site plans must show existing conditions, conditions existing prior to a violation, proposed development, and construction management. A mitigation site plan is required whenever the proposed development will result in unavoidable significant detrimental impact on the identified resources and functional values. A remediation site plan is required whenever significant detrimental impacts occur in violation of the Code and no permit was applied for. The Director of PP&D may waive items listed in this subsection if they are not applicable to the specific review; otherwise they must be included. Additional information such as wetland characteristics or soil type may be requested through the review process. 1. Site plans must show the following: a. For the entire site: • Combined flood hazard area and floodway boundaries; • Boundaries of the Pleasant Valley Natural Resources overlay zone. These boundaries may be scaled in relation to property lines from the Official City Zoning Maps; • Topography shown by contour lines at two-foot vertical contours in areas of slopes less than ten percent and at five-foot vertical contours in areas of slopes ten percent or greater; • Drainage patters, using arrows to indicate the direction of major drainage flow; and • Existing improvements such as structures, or buildings, utility lines, fences, etc. b. In areas of the site that have been or will be disturbed: • Distribution outline of shrubs and ground covers, with a list of most abundant species; • A grading plan showing proposed alteration of the ground at two-foot vertical contours in areas of slopes less than ten percent and at five-foot vertical contours in areas of slopes ten percent or greater; and • Trees greater than six inches in diameter, identified by species. In the case of violations also indicate those that were cut or damaged by stump diameter and species. c. In areas of the site that are and will remain undisturbed: Tree crown cover outline, and generalized species composition. 2. A construction management site plan including: • Areas that will be permanently disturbed; • Areas that will be temporarily disturbed, including equipment maneuvering areas and the location of perimeter controls; • Areas where existing topography and vegetation will be left undisturbed; • Location of site access and egress; • Equipment and material staging and stockpile areas; • Erosion control measures; and • Measures to protect trees and vegetation. Tree protection must meet the requirements of Chapter 11.60, Technical Specifications. 3. A mitigation or remediation site plan including: • Dams, weirs, or other in-water structures; • Distribution outline, species composition, and percent cover of ground covers to be seeded or planted; • Distribution outline, species composition, size, and spacing of shrubs to be planted; • Location, species, and size of each tree to be planted; • Stormwater management features, including retention, infiltration, detention, discharges, and outfalls; • Water bodies to be created, including depth; • Water sources to be used, including volumes; and • Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings. B. Supplemental narrative. The following is required: 1. Impact evaluation. An impact evaluation is required to determine compliance with the approval criteria and to evaluate development alternatives for a particular site. The alternatives must be evaluated on the basis of their impact on the resources and functional values of the site. In the case of a violation, the impact evaluation is used to determine the nature and scope of the significant detrimental impacts. To the extent that the site resources and functional values are part of a larger natural system such as a watershed, the evaluation must also consider the cumulative impacts on that system. The impact evaluation is based on the resources and functional values identified as significant in the Pleasant Valley Natural Resources Protection Plan; a. An impact evaluation includes: (1) Identification, by characteristics and quantity, of the resources and their functional values found on the site; (2) Evaluation of alternative locations, design modifications, or alternative methods of development to determine which options reduce the significant detrimental impacts on the identified resources and functional values of the site; and (3) Determination of the alternative that best meets the applicable approval criteria and identify significant detrimental impacts that are unavoidable. b. An impact evaluation for a violation includes: (1) Description, by characteristics and quantity, of the resources and functional values on the site prior to the violation; and (2) Determination of the impact of the violation on the resources and functional values. 2. Construction management plan. Identify measures that will be taken during construction or remediation to protect the remaining resources and functional values at and near the construction site and provide a description of how undisturbed areas will be protected. For example, describe how trees will be protected, erosion controlled, construction equipment controlled, and the timing of construction; and 3. Mitigation or remediation plan. The purpose of a mitigation or remediation plan is to compensate for unavoidable significant detrimental impacts that result from the chosen development alternative or violation as identified in the impact evaluation. A mitigation or remediation plan includes: • Resources and functional values to be restored, created, or enhanced on the mitigation or remediation site; • Documentation of coordination with appropriate local, regional, special district, state, and federal regulatory agencies; • Construction timetables; • Operations and maintenance practices; • Monitoring and evaluation procedures; • Remedial actions for unsuccessful mitigation; and • Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.