Monitoring plan requirements.
San Antonio City Code § 34-1020
in effectSec. 34-1020. - Monitoring plan requirements.
(a) The owner or operator of each facility regulated by this division shall submit to the resource protection and compliance department an inventory of the equipment which makes up the UST system and a plan for monitoring the integrity of the UST system and surrounding site (monitoring plan). The monitoring plan shall be sufficient to ensure that each UST system operates in a safe manner according to all federal, state, and local regulations, and to ensure the UST system will not pose a present or future threat to the water quality of the Edwards Aquifer or affect the public health, safety or the environment.
(b) Each monitoring plan shall provide the method and frequency of monitoring and an inventory of the monitoring equipment which will be installed and maintained (see Section 34-1007(d)(1)). This inventory shall include, at a minimum, the following information for each of the following categories:
1. UNDERGROUND STORAGE TANKS
(a) Number
(b) Size
(c) Material constructed from
(d) Number of layers
(e) Manufacturer and model type if applicable
2. PIPING
(a) Primary Piping
(i) Material constructed from
(ii) Diameter
(iii) Manufacturer
(b) Secondary Piping
(i) Material constructed from
(ii) Diameter
(iii) Manufacturer
3. OVERFILL PREVENTION MANHOLE
(a) Manufacturer and model type
(b) Capacity
4. OVERFILL PREVENTION DEVICE
(a) Manufacturer and model type
5. SUBMERSIBLE PUMP
(a) Manufacturer and Model Type
6. LEAK DETECTOR FOR PIPING SYSTEM
(a) Manufacturer and model type
7. SHEAR VALVE
(a) Manufacturer and model type
8. ELECTRONIC LEAK DETECTION SYSTEM
(a) Automatic Tank Gauging
(i) Manufacturer and model type
(ii) Whether continuous tank testing and pipe testing used
(b) Interstitial Monitor
(i) Manufacturer and model type
(ii) Liquid or vapor
10. MONITORING WELLS
(a) Number of wells
(b) Vapor monitoring in wells
(c) Groundwater monitoring in wells
11. EXCAVATION LINER
(a) Manufacturer and type
(b) Material constructed from
(c) Thickness (mil)
(d) Permeability
12. VAULT
(a) Manufacturer and type
(b) Material constructed from
(c) Sealant
(d) Whether Pre-Stressed
13. ANY OTHER EQUIPMENT WHICH OPERATES AS PART OF THE SYSTEM
14. THIRD-PARTY CERTIFICATIONS FOR EQUIPMENT, as applicable.
(c) The monitoring plan shall incorporate sufficient requirements to ensure that the UST system is in good operating condition and that all protective measures are functioning properly. Each monitoring plan should describe everything done by the owner or operator to ensure that no leaks or spills of regulated materials occur at the facility, and how a leak or spill would be detected if it should occur.
(d) If any of the information contained in a monitoring plan becomes outdated, the owner or operator shall update the plan pursuant to Section 34-1010 of this division and shall be required only to follow the procedures described in the most recent version of the approved monitoring plan.
(e) Each monitoring plan shall provide a description of storage and dispensing systems in sufficient detail to show that the proposed monitoring and/or testing methods are appropriate and shall describe the methods and materials use in construction of the UST tanks and piping, type of backfill, any manifolding of tanks or lines, type of delivery system (e.g., suction or submerged pump, metered or non-metered), vapor recovery systems, and any other pertinent information.
(f) Each monitoring plan shall clearly indicate the monitoring method which will be used (e.g., tank system testing, monitoring wells) and the policies, including responsibilities and frequency of inspecting monitoring equipment, to ensure the plan is followed.
(g) Identification and explanation of the inventory control systems of regulated substances shall be provided as a part of the monitoring plan. All inventory control methods used shall meet 40 CFR 280.43, which requires product inventory control to be conducted monthly to detect a release of at least 1.0 percent of flow-through plus one hundred thirty (130) gallons on a monthly basis. A blank copy of the inventory record forms used should be submitted with a description of how and when reconciliations are performed.
(h) Each monitoring plan shall include policies which allow the permittee or its designee to demonstrate, when inspected, that inventory volume measurements were recorded each day, that product dispensing was metered and recorded within the local standards for meter calibration or an accuracy of six (6) cubic inches for every five (5) gallons of product withdrawn, and that the water level in the bottom of the tank was measured to the nearest one-eighth of an inch at least once a month.
(i) If applicable, the leaking petroleum storage tank site number shall be listed in the monitoring plan and an indication given whether a closure letter has been issued for the site or if the site is still being remediated.
(j) A maintenance plan for structural and Best Management Practices which has been used to abate stormwater runoff shall be incorporated into the monitoring plan. Maintenance should be performed as outlined in the Texas Natural Resource Conservation Commission (TNRCC) document, "The Edwards Aquifer Technical Guidance Manual."
(Ord. No. 83200, § 1(App. I), 11-16-95; Ord. No. 2006-02-16-0241, § 5, 2-16-06)