For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 65.050 — Prohibited excavations

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 65.050

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/e4b1aa51-8333-418a-8e79-964773c7aa90

Sec. 65.050. - Prohibited excavations.

(a) Except as provided in this subsection and in SRC 65.080, no excavation shall leave a cut slope greater than two horizontal to one vertical. EXCEPTION: Excavations may exceed this limitation when they are in conjunction with a building permit and the final grade after backfill will not exceed a 2:1 slope. (b) Excavation within any recorded utility easement is prohibited without 48-hour notice to the utilities holding the easement and the Director. (c) Excavations, other than sand and gravel mining under a valid conditional use permit, are prohibited in floodplain overlay zones and waterways, except as provided in SRC 65.080 or when such excavations are done under a permit issued by the Oregon Division of State Lands.

(Prior Code, § 65.050; Ord. No. 69-79; Ord. No. 79-88)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.