§ 14.08.240 — Plan to conform to actual installation
Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 14.08.240
Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/e551792e-d863-4323-a089-309a3ca89aed
14.08.240 - Plan to conform to actual installation.
Every person owning, using, controlling or having an interest in any facilities in a right-of-way, except a service pipe or pipes, shall file in the office of the City Engineer, within sixty (60) days after the completion of installation of the facilities, a corrected record plan drawn to scale of not more than forty feet to the inch (40′ = 1″), showing the facilities provided, however, that if the plan filed with the City Engineer at the time the permit is issued is correct in every detail, permittee may make a notation to that effect on the plan, and the plan shall constitute compliance with this Section. Final acceptance by the City Engineer for the work performed under the permit is dependent on full compliance with this Section.
(ORD-19-0032 § 10, 2019; Ord. C-7933 § 1, 2004)
Ask a question about Long Beach law
Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
