§ 11-5-6 — Stormwater Quality Management for Land Development

Boulder Revised Code 1981 (Supplement167; ordinances effective through July30,2026; five publisher-pending ordinances held); partial · Boulder Revised Code 1981 § 11-5-6

Corpus is an independent public-information project, not the official City of Boulder website. Stable reference: corpuslaw.us/code/e55c3e9a-d7c1-4afb-902d-e856a213d607

11-5-6. - Stormwater Quality Management for Land Development.

(a) Drainage Facilities Required: No person engaged in new development or redevelopment shall fail to provide on such property all reasonably necessary drainage facilities to ensure adequate drainage and management of stormwaters and floods falling on or flowing onto the property. (b) Erosion Control Permit Required: No person shall commence construction activities before obtaining an erosion control permit. (1) Compliance With Permit Required: No person shall fail to conduct construction activities consistent with the approved erosion control permit and the requirements of this chapter and the City of Boulder Design and Construction Standards. (2) Permit Application: An applicant for an erosion control permit shall file a completed application on a form provided by the city manager that shall include, without limitation, the following: (A) If the construction activities result in a land disturbance of greater than or equal to one acre, or if less than one acre are part of a larger common plan of development or sale that would disturb or has disturbed one acre or more: (i) A copy of a Colorado Discharge Permit System General Permit for Stormwater Discharges Associated with Construction Activities issued by the Colorado Department of Public Health and Environment; (ii) A stormwater management plan consistent with the requirements of Section 7.13 of the City of Boulder Design and Construction Standards and using forms provided by the city manager; (B) If the construction activities result in a land disturbance of less than one acre and is not part of a common plan of development or sale, an erosion control plan consistent with Section 7.13 of the City of Boulder Design and Construction Standards; (C) Any additional information the city manager deems necessary to determine whether the requirements of this chapter and the City of Boulder Design and Construction standards for construction activities have been met; and (D) The fee described by Section 4-20-71, "Erosion Control Permit Fee," B.R.C. 1981. (3) Expiration: All construction activities covered by the permit shall be completed by the date approved in the permit. Permits shall expire and be void if the activities authorized by the permit have not commenced within 180 days after its issuance, or if the activities authorized by the permit are suspended or abandoned for a period of 180 days. The city manager may grant in writing one or more extensions of time for periods not to exceed 180 days each if the applicant demonstrates justifiable cause in writing. (4) Control Measures for Erosion and Sediment Control Required: Control measures for erosion and sediment control shall be selected, designed, installed and maintained in conformity with the approved erosion control permit and the City of Boulder Design and Construction Standards. No person shall violate the inspection and maintenance requirements established in the City of Boulder Design and Construction Standards for such control measures approved in the erosion control permit. (c) Final Drainage Report Required: Before the city manager issues a city building permit for the applicable development site, the property owner or building permit applicant shall submit to the manager a detailed final drainage report that meets state and federal requirements, this chapter, and the City of Boulder Design and Construction Standards. A permit will not be issued until the manager determines, based upon generally accepted engineering principles in storm and drainage control, that the report meets the requirements of this chapter and the provisions of the master drainage plan that relate to the drainage basin in which the property is located. (1) Compliance With Approved Report Required: No person shall fail to comply with an approved final drainage report submitted under this section. (2) Report Required With Development Application: No person shall receive an approval for a subdivision or site review under this code or any ordinance of the city unless the person submits and obtains approval of the final drainage report required by this section. (3) On-Site Detention and Control Measures for Post-Construction Water Quality Required: On-site detention storage and control measures for post-construction water quality shall be designed, installed, and implemented in accordance with the reasonable requirements of urban hydrology and the standards established in the City of Boulder Design and Construction Standards. (A) No owner of SCMs shall fail to maintain in operational condition any on-site detention facility or control measure for post-construction water quality that is required as part of a final drainage report or other approval, in accordance with the City of Boulder Design and Construction Standards or any inspection requirements or conditions of approval. (B) No owner of SCMs shall fail to inspect any on-site detention facility or control measure for post-construction water quality at least once per year or as required in the City of Boulder Design and Construction Standards or any conditions of approval. (C) No owner of SCMs shall fail to keep on file all records of maintenance and service of any on-site detention facility or control measure for post-construction water quality for a minimum of five years. The city manager may change the duration of the record keeping requirements based upon the needs of the development. All records shall be made available for review by the city manager immediately upon request. (d) Waiver of Requirements: The city manager may waive any or all of the requirements of this section or impose additional requirements, if such waiver or additional requirement is reasonably necessary due to the existence of special geological or topographical conditions and meets the purposes of this chapter prescribed by Section 11-5-1, "Legislative Intent," B.R.C. 1981, or as may be allowed under the City of Boulder Design and Construction Standards. (e) Easement for Drainage Way Required: No owner of a parcel of land through which a natural drainage way flows as shown on the master drainage plan shall obtain a building permit to develop the property, unless the person first grants to the city at no charge a permanent easement to construct, maintain or reconstruct the channel along the drainage way. (f) Financial Guarantee: In order to guarantee the construction of any on-site detention facility or control measure for post-construction water quality shown on an approved final drainage report submitted under this section, the owner of the land shall submit to the city a financial guarantee in a form satisfactory to the city manager for the construction of the facility, before any building permit is issued that meets the requirements of Section 9-2-21, "Financial Guarantees," B.R.C. 1981. Ordinance Nos. 7400 (2004); 8323 (2019)

Ask a question about Boulder law

Corpus searches the Boulder sections it holds and shows the ones that match, with their citations. Free, no sign-in.