For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.16.1140 — Credits for construction

San José Municipal Code (Supp. No. 5: codified through Ordinance No. 31341, enacted August 25, 2026) · San José Municipal Code § 15.16.1140

Corpus is an independent public-information project, not the official City of San Jose website. Stable reference: corpuslaw.us/code/e5fa8f11-4d9a-4dd4-b0b7-7a50bf698108

15.16.1140 - Credits for construction.

Whenever permanent storm drainage facilities are required by the city to be constructed and installed at no cost to the city on any land privileged and/or benefited in the manner described in Section 15.16.910 and/or constructed and installed on any areas adjacent thereto in connection with the development of such land, which facilities are constructed or are caused to be constructed by the owner of such land pursuant to and in accordance with such requirements, an amount of money based on the type of such permanent storm drainage facilities constructed and installed on such land and/or on such areas adjacent thereto, computed as set forth below shall, at the time storm drainage fees are paid by such owner, be credited against storm drainage fees chargeable to such owner, provided such facilities are owned by the city at the time the owner pays such fees, or will be owned by the city upon acceptance thereof by the city, until the amount of such credit is exhausted. In the event that the amount so credited under this section exceeds the storm drainage fees which are chargeable to such owner, the amount of such excess shall be credited against future storm drainage fees chargeable to such owner at the time such future storm drainage fees are paid by such owner until the amount of such excess is exhausted, or such excess may be assigned to others. In the event such excess is assigned, the assignee of such excess credits shall be entitled to offset the amount of such excess credits against future storm drainage fees chargeable to such assignee until the amount of such excess is exhausted. Credits under this section shall terminate ten years after the acceptance by the city of the construction and installation of facilities on which such credits are based. In no event shall credits under this section take the form of cash or money payments. Said amounts to be credited pursuant to this section shall be calculated as follows: Type of Facilities Delivered and Installed | Amount of Credit 30" inside diameter reinforced concrete pipe, per lineal foot.... | $ 16.00 33" inside diameter reinforced concrete pipe, per lineal foot.... | 19.00 36" inside diameter reinforced concrete pipe, per lineal foot.... | 22.50 42" inside diameter reinforced concrete pipe, per lineal foot.... | 27.75 48" inside diameter reinforced concrete pipe, per lineal foot.... | 32.50 54" inside diameter reinforced concrete pipe, per lineal foot.... | 38.50 60" inside diameter reinforced concrete pipe, per lineal foot.... | 44.25 Manholes, each.... | 405.00

(Prior code § 7399.2; Ords. 20191, 20196.)

Ask a question about San Jose law

Corpus searches the San Jose sections it holds and shows the ones that match, with their citations. Free, no sign-in.