For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 74.390 — Reports of potential problems

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 74.390

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/e6656c82-a5ba-4ebb-a39a-d842125c6e85

Sec. 74.390. - Reports of potential problems.

(a) If an accidental, slug, or other discharge occurs which may cause problems for the municipal wastewater system, the user shall immediately notify the City by telephone of the incident. Notification shall include the location of discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user. (b) Unless waived by the Director, within five days following an accidental discharge, the user shall submit a detailed written report describing the cause of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any fines, civil penalties, expense, loss, damage, or other liability which may be incurred or imposed as a result of damage to the municipal wastewater system, natural resources, or persons or property. (c) Failure to notify the City of potential problem discharges shall be deemed a separate violation of this chapter. (d) Industrial users shall prominently post a notice on a bulletin board or other similar place readily accessible to the user's employees, advising the employees of whom to call in the event of a potential problem discharge, and shall train all employees in the emergency notification procedure. (e) Where the City has performed the sampling and analysis in lieu of the industrial user, the control authority must perform the repeat sampling and analysis unless it notifies the user of the violation and requires the user to perform the repeat analysis as required in SRC 74.370(b) and (c). Resampling may not be required if: (1) The City performs sampling at the industrial user at a frequency of at least once per month; or (2) The City performs sampling at the user between the time when the initial sampling was conducted and the time when the user or the control authority receives the results of this sampling. Cost to the City for repeat analysis may be recouped per SRC 74.430.

(Prior Code, § 74.390; Ord. No. 13-96; Ord. No. 65-2002; Ord. No. 25-06)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.