§ 48.140 — Soil sampling required for storage tank closure
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 48.140
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/e695c0c1-f131-4ad6-aa16-0212f92d3161
48.140. - Soil sampling required for storage tank closure.
When any regulated substance storage tank in excess of one thousand one hundred (1,100) gallons is removed or abandoned in place, soil samples shall be taken at time of removal/abandonment as described below. Tanks that have external release detection, and have been operated according to the requirements of Minnesota Rules Part 7150.0330 shall be exempt. Within forty-five (45) days a report shall be submitted to the authority documenting the presence or absence of any contaminant release. (1) For tanks less than ten thousand (10,000) gallons in size, at least one (1) soil sample shall be taken under the center of the tank, one (1) to two (2) feet below the floor of the tank excavation. (2) For tanks greater than ten thousand (10,000) gallons in size at least two (2) soil samples shall be taken near the base of the tank, one (1) below the fill pipe and the other on the opposite end. (3) In addition to the sampling required in (1) and (2), a soil sample shall be taken five (5) feet below each dispenser island, where the dispenser island is not located over the tank basin. (4) Compliance with this section shall not imply absence of contamination at tank site. (2002-Or-169, § 10, 11-8-02)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.