Sec. 106-214. - Tree protection near construction work.

(a) Any construction work that occurs within the CRZ of a city tree requires the presence of an arborist to ensure that correct arboreal practices are followed. (b) Prior to the commencement of construction, and with the prior written approval of the department, an arborist must identify each city tree that will require trimming to clear for construction. (c) Cutting, trimming, removing, spraying, treating, or planting any city tree or city vegetation without prior written approval by the department is prohibited. (d) The contractor shall be responsible for damage to all city trees and city vegetation and shall be liable to the city, for either compensation or tree replacement, as determined by the department. (e) When an approved construction plan specifies for the removal of city trees or city vegetation, the owner, contractor, or agency authorizing the work shall compensate the city prior to beginning construction. (f) If it is found that city trees or vegetation must be removed to complete a project and the department agrees to the removal, the trees or vegetation shall be transplanted to adjacent city property if possible and shall meet all additional department planting specifications, including one year of watering. If it is not possible to transplant the plant materials the city shall be compensated for the city trees or city vegetation. (1) Compensation may include replacement planting on the city portion of the construction site or on nearby city property. The minimum rate of replacement shall be one caliper inch of replacement tree for each inch of DBH as assigned by the project survey or department. (2) If it is not possible to plant a replacement tree on the city property portion of the construction site or on nearby city property, the city may accept a monetary amount equal to the replacement cost of the tree based upon current market conditions and the DBH, condition, and height of the tree to be removed. (g) Installation of tree protection fencing is required around all city trees prior to construction and shall stay in place for the duration of construction. (1) Tree protection fencing shall include a wood or chain link barricade at least five feet high along the CRZ and shall avoid damaging trees and plant materials unless an alternative tree protection method is approved in writing from the department. (2) The removal of tree protection fencing during construction is prohibited. (3) The contractor or property owner shall contact the department for an inspection of the tree protection fencing prior to the commencement of any site work, including demolition or clearing. (4) Tree protection fencing shall carry durable signs designating the area as "Tree protection zone. No entry unless authorized by the Department of Parks and Parkways". Such signs shall be spaced around the perimeter of all tree protection zones with a maximum spacing of 25 feet. Signs shall be a minimum eight inches by ten inches in size and shall be firmly affixed to the tree protection fence. (h) Signs, barricades, equipment, or materials shall not be attached to city trees or plant materials. "Overhead Clearance" signs may be loosely attached using a rope or chain when approved by the department. (i) If a route for machinery is required through a grove of city trees, the department may allow a temporary pathway through the grove. Such a pathway shall be as narrow as practical, temporarily covered with eight inches of wood chips and a layer of plywood and enclosed by protective fencing on both sides. (j) When construction work is taking place within the CRZ of a city tree, including sidewalk, drainage work, utility work, or planting, all work shall be completed without the use of heavy equipment and must receive prior approval from the department. (1) Use of an air spade, hand-digging, or similar technology may be required to reveal the roots for preventative pruning by an arborist under the supervision of department. (2) Alternative means for utility installation, such as tunnelling and boring, may be required where deemed necessary by the department. (3) Alternative paving methods such as sidewalk bridging, flexible paving, ADA compliant gravel, and other technologies may be required as deemed appropriate by the department. (k) The department may order additional tree protection measures if site conditions warrant them. (l) Each city tree shall be irrigated at least two times per week for the period of April through October over the duration of the project. (m) Trenching within the CRZ of any city tree is prohibited. If work within the area within the CRZ cannot be avoided, the department may grant permission for the work and shall require the use of boring or air spade equipment to tunnel beneath the CRZ. The minimum depth for boring is 30 inches and tunneling shall be located as far from the trunk as possible.

(M.C.S., Ord. No. 30255, § 1, 3-27-25)

Ask a question about New Orleans law

Corpus searches the New Orleans sections it holds and shows the ones that match, with their citations. Free, no sign-in.