Sec. 49-47-1. - Excavation in new or streets in good condition.
The permittee shall complete pavement restoration of the excavated area within thirty (30) days on arterial and collector streets and within thirty (30) days on residential and alley streets after final backfill is completed and accepted by the director. The permittee shall conduct the work with a minimum disturbance to existing utilities and shall coordinate all work in or near the existing utilities with the utility owners. (1) Excavation in new asphalt pavement streets and alleys. There shall be no excavation in new streets, as defined in this article, without a variance from the director. Any request for a permit to excavate a new street shall include a description of the proposed work and proposed restoration of the area, per requirements by the director or defined in the construction standards, as well as a statement as to why alternate procedures cannot or should not be used in lieu of excavating a new street. a. The minimum width of restoration for excavations granted in new streets shall extend from the full width of impacted lane(s) up to curb to curb on any street. b. Any street (0—six years and PCI ≥eighty (80)). For excavations granted in new streets, the length of restoration shall extend a minimum of twenty-five (25) feet beyond the edge of the excavation. The age is measured from the date of acceptance by the city. The overlay thickness shall match the existing pavement section at a minimum. c. The final surface shall be in accordance with construction standards. d. The director may require additional restoration limits, in addition to the minimum lengths defined in this article, for diagonal cuts or perpendicular cuts ten (10) feet or less apart. e. Permittee shall be required to submit a letter of variance if restoration is proposed to vary from the construction standards. (2) Permitted excavation in streets and alleys. a. A permit shall be granted in accordance with this article for streets and alleys with a pavement condition index less than eighty (80) or greater than six (6) years in age. The age is measured from the date of acceptance by the city. b. Streets and alleys (> six (6) years or PCI < eighty (80)). The width of restoration limits shall be the full lane, at minimum. The length of restoration shall extend a minimum of ten (10) feet beyond the outermost edge of excavation. The overlay thickness shall match the existing pavement section at a minimum. Trench requirements shall comply with the construction standards. c. The final surface shall be in accordance with construction standards. d. A permit holder shall perform jacking and boring operations in a manner that does not weaken or impair the right-of-way upon completion of restoration of the excavation. e. Excavation in all streets in good condition regardless of age should not occur without prior approval of the director. Streets assigned a PCI of seventy (70) or above by the pavement management system are deemed to be in good condition and are subject to the review procedures of excavation of new streets. f. Restoration of the excavated area of streets in good condition shall be in accordance with this article. g. The director may require additional restoration limits, in addition to the minimum lengths defined in this article, for diagonal cuts or perpendicular cuts ten (10) feet or less apart. (3) Excavation in Portland cement concrete (PCC) pavement surface. If the existing pavement is PCC, the concrete shall be cut first with a saw to a minimum depth of half the thickness of the concrete which shall also cut the reinforcing steel. The concrete can then be broken out with an air chisel or pavement breaker. No more than six (6) inches of PCC shall be broken back beneath the saw cut. Any street excavation/cut shall repair the impacted trench and replace full panels, at minimum. Further criteria is set forth in the construction standards. The guidelines for jacking and boring are set forth in the construction standards.
(Ord. No. 033299, § 3, 2-13-2024)