§ 15-1507 — ADDITIONAL STANDARDS
Fresno Municipal Code (Supp. No. 55, Update 1 (online June 23, 2026): codified through Ordinance No. 2026-019) · Fresno Municipal Code § 15-1507
Corpus is an independent public-information project, not the official City of Fresno website. Stable reference: corpuslaw.us/code/e81b859b-2a2a-4505-8382-cef6e549e614
SEC. 15-1507. - ADDITIONAL STANDARDS.
A. Projects shall incorporate all relevant mitigation measures required pursuant to applicable environmental assessments prepared pursuant to CEQA that encompass the project area. "Applicable Environmental Assessments" shall include, but may not be limited to the following: 1. A MEIR prepared for the General Plan in effect at the time of project approval; 2. A Program or Project EIR prepared for either a Community Plan or Specific Plan that includes the project area, in effect at the time of project approval. B. The proposed design shall not lead to an overburdening of existing or planned infrastructure capacities, including, but not limited to, capacities for water, runoff, storm water, wastewater, and solid waste systems. The determination of whether or not the proposed design can be accommodated within existing infrastructure shall be made by the Review Authority in consultation with the Directors of Public Works and Public Utilities. C. The project shall comply with all applicable Public Works standards.
(Added Ord. 2016-43, § 2, eff. 12-9-16).
Ask a question about Fresno law
Corpus searches the Fresno sections it holds and shows the ones that match, with their citations. Free, no sign-in.
