91.530. - Fee calculation for heating, ventilation, and air-conditioning permits.
The building official, before issuing any permit for the construction, installation, alteration, addition or repair of any furnace, boiler, heating or power plant or system, or any device or equipment connected therewith, or for any other device connected or to be connected with any chimney or stack, or for the construction, installation, alteration, addition or repair of any air-conditioning system or ventilation system or sheet metal ductwork or equipment connected therewith, shall require the payment by the applicant for such permit of the fee or fees in the amount established herein. Such permit fees shall be published and maintained in the Title 5 fee schedule pursuant to section 91.100 of this Code and shall be based on the following valuation categories:
Not exceeding $50,000.00.
$50,001.00 and over.
The fee for heating, ventilation, and air-conditioning work in existing one- and two-family dwellings shall be fixed according to the fee established in the Title 5 fee schedule pursuant to section 91.100 of this Code. (Ord. No. 2019-034, § 1, 8-23-19)