For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 42-248 — Electric vehicle charging station—Permit required

Wilmington City Code, Delaware (Supp. No. 72: codified through Ordinance No. 25-073, enacted December 11, 2025) · Wilmington City Code § 42-248

Corpus is an independent public-information project, not the official City of Wilmington website. Stable reference: corpuslaw.us/code/e8c3334e-6515-4060-b376-3db8b5a74073

Sec. 42-248. - Electric vehicle charging station—Permit required.

(a) Prohibition. No person may install or maintain, or cause or permit to be installed or maintained, an electrical vehicle charging station beyond the true building line of the streets of the city, or at such other location that encroaches upon the public right-of-way, except under conditions prescribed in this section. (b) Application. A person who owns or lawfully occupies a residential property, owns, leases, or is the frequent operator of an electric vehicle, and does not have off-street parking for a vehicle located on the residential property may apply to the city for a permit to install and maintain an electric vehicle charging station in the public right-of-way by submitting to the city: (1) An application fee of $100.00; (2) A completed application which must include: a. The applicant's name, address, phone number, and, if available, email address; b. Either proof that the applicant owns the residential property where the charging station is to be located, or, if the applicant is not the owner, an affidavit from the owner of the residential property authorizing the application; c. The written approval of the department of transportation of either the State of Delaware or the city, depending upon which governmental entity is responsible for the maintenance of the particular street, road, or alley adjacent to the public right-of-way on which the electric vehicle charging station is proposed to be located. Notwithstanding the written approval from the state to install a charging station when located in the public right-of-way adjacent to a state owned or maintained street, road, or alley, an applicant for a permit must satisfy all other requirements and conditions set forth in this section. d. A map or drawing marked to show where the charging station will be located on the public right-of-way; e. An installation plan for the charging station that includes a diagram of all electrical connection upgrades, trenching, how the electrical line will be run underground, and a plan how the public right-of-way will be returned to its pre-installation condition; f. If the charging station is to be located in a historic or conservation district of the city, a completed copy of an application that has been approved by the DRPC; g. Proof of approval from the electrical utility provider; h. The names, addresses, phone numbers and, if available, email addresses of all contractors and subcontractors who will install the charging station; i. An agreement satisfactory to the city to indemnify the city for any harm to property or persons caused by the charging station; j. A certificate of insurance coverage satisfactory to the city for the charging station, including proof of comprehensive general liability coverage for personal injury, including death, and property damage associated with ownership of the charging station from a financially sound and reputable carrier; k. Proof of the community notice required in subsection (c); and l. The applicant's and, if the applicant is not the owner, also the property owner's, sworn affidavit promising to maintain the charging station in good and safe working condition up to all applicable codified standards, to remove the charging station if the city determines that the charging station is no longer in use or is not being maintained in the condition required by this division, and to return the public right-of-way to its preinstallation condition at the permit holder's expense. When the applicant is not also the owner of the residential property where a charging station is to be installed and maintained, the property owner is deemed to be a permit holder along with the applicant and to be subject to all of the conditions, obligations, and enforcement actions that are authorized by this division against the applicant. (c) Community notice and hearing. (1) An applicant for an electric vehicle charging station must fill out and then hand-deliver the following notice to resident neighbors on both sides of the street of the block where the charging station is to be located: "PLEASE BE ADVISED THAT BECAUSE YOU ARE A RESIDENT LIVING ON THE SAME BLOCK WHERE IT IS BEING PROPOSED THAT AN ELECTRIC VEHICLE CHARGING STATION WILL BE INSTALLED AT ___________[address], YOU MAY LODGE A WRITTEN OBJECTION TO ITS INSTALLATION BY DELIVERING TO THE CITY OF WILMINGTON DEPARTMENT OF LAND USE AND PLANNING A SIGNED OBJECTION WITH YOUR NAME, ADDRESS AND PHONE NUMBER NO LATER THAN THE CLOSE OF BUSINESS ON ___________[due date of a timely objection to be provided by the City]." The notice with the due date filled in must be delivered no later than 14 days before the due date in order to constitute valid community notice. (2) Notwithstanding the eligibility requirement set forth above in subsection (b), as part of the approval process the city may grant a variance to a person who has off-street parking available on the residential property if the person is otherwise eligible to apply for a permit, satisfies the other requirements of this section, and provides substantial evidence to the city that the block has sufficient parking space available for others. An application for a permit for a person seeking such a variance is not complete until such proof is provided to the city. (3) If the city receives one or more timely objections from a resident neighbor on the block where the charging station is to be located, then the city must hold a public hearing before deciding whether to grant or deny the application. (d) Review. Whether or not a public hearing is required or held, the city must either approve or deny an application for the installation of an electric vehicle charging station that will encroach upon the public right-of-way within 90 days of the final submission of a completed application to the city, or, by operation of law, the application will be automatically approved. (e) Notwithstanding a decision to approve an application under this section, an applicant must obtain all other building permits that may be required for the work to be done. (f) Requirements for a permit to install an electric vehicle charging station. The city may not grant, and must deny, a permit for an electric vehicle charging station unless the specifications in the application show it will: (1) Meet all applicable legal requirements under municipal, state, and federal law, including Article 625 (Electric Vehicle Charging and Supply Equipment Systems) of the National Electric Code (NEC), as most recently amended, restated or replaced; (2) Be installed and fastened in place with a retracting cable, or other cable management system satisfactory to the city, to ensure the charging cable is not a tripping hazard when not in use; (3) Be UL-listed, rated for outdoor use; (4) Be installed according to manufacturer's specifications; (5) Be installed with a locking cover, or other mechanism meant to prevent unauthorized use, for the connector/cable; (6) Not have any exposed energized components or above ground supply lines; (7) Be installed by a licensed electrician; (8) Be installed where street parking is currently permitted; (9) Have an emergency shut-off switch (which need not be on the charging station itself); and (10) Have the written permission of the owner of the residential property. (g) Other required considerations for installation of an electric vehicle charging station. The city must consider whether, and may deny an application for a permit if: (1) An application remains incomplete for three months after the city notifies the applicant of its deficiency; or (2) The installation of the charging station as proposed by the applicant would: a. Adversely impact compliance with ADA Standards for Accessible Design by impeding access to a sidewalk, bus shelter, curb cut, or other existing or planned accessibility accommodation; b. Interfere with any existing or planned utility infrastructure; c. Be inconsistent with an existing or planned streetscape or landscape design for the public right-of-way; d. Interfere with existing or planned stormwater, drain management, or other infrastructure in the public right-of-way; e. Cause there to be inadequate pedestrian walkway space; f. Be so close to the street as to prevent, or render unsafe, motor vehicle parking or a person exiting a parked motor vehicle at the location; g. Not adequately provide for or ensure a permit holder's maintenance of the electric vehicle charging station or removal and restoration of the public right-of-way when an unused or noncompliant charging station is removed; h. Be contrary to the recommendation of the DRPC after its review of the installation plan in a historic or conservation district, or i. Pose a risk to public health and safety. (h) The DRPC may promulgate regulations of design standards for electric vehicle charging stations within historic and conservation districts. (i) Conditional retention of a permit and revocation. As a condition of retaining the permit, a permit holder under this section has the continuing duty to use and maintain the electric vehicle charging station: in compliance with the requirements of this section, municipal, state and national law, including article 625 (Electric Vehicle Charging and Supply Equipment Systems) and other applicable portions of the National Electric Code (NEC), as most recently amended, restated or replaced; in a manner that is consistent with the permit holder's application as it was approved by the city; and in compliance with all additional requirements the city may have imposed upon the permit holder at the time of approval. As a further condition, the permit holder must ensure that any person the permit holder permits to use and/or maintain the charging station fulfills the foregoing duties. In addition to any other remedies available to the city at law or in equity, if the city finds that the permit holder is in violation of these duties, then the city may revoke the permit and require the charging station to be immediately deenergized, and either order the permit holder to remove the electric vehicle charging station from the public right-of-way within 30 days at the permit holder's sole expense, or, if the permit holder refuses or fails to remove the charging station within 30 days or to deenergize the charging station, then the city may deenergize and/or remove it and charge the permit holder for the costs of deenergizing, removal, and/or restoration of the public right-of-way to its pre-installation condition. The imposition of all such costs shall be a lien upon the residential property. (j) An aggrieved person may appeal the city's approval, denial, or revocation of a permit for an electric vehicle charging station or the issuance of a civil violation under this section to the board of license and inspection review pursuant to Wilmington City Charter section 5-705 within 30 days of the action being appealed. (k) Enforcement. (1) Criminal violation. A person who installs or maintains an electric vehicle charging station in the public right-of-way without applying for a permit, or after beginning the application for a permit process before being fully approved, is guilty of a violation and may be fined up to $200 for the offense, and that person shall be guilty of a separate offense and may be fined up to $200.00 for each subsequent seven-day time period during which the violation continues to exist. No notice is required before a person may be charged, and the city's decision to charge this violation may not be appealed to the board of license and inspection. (2) Civil violation. A person who continues to maintain an electric vehicle charging station that was installed before the effective date of this division without applying for a permit; installs or maintains an electric vehicle charging station for which a permit was denied; installs or maintains an electric vehicle charging station after being notified by the city that the permit has been revoked and that the charging station must be deenergized or removed; or installs or maintains an electric vehicle charging station in a manner that is otherwise prohibited by this division may be issued a notice of violation and fined $200.00 for each seven-day time period during which the violation continues to exist; except that the accrual of fines for the violation shall be stayed upon the filing of a timely appeal to the board of license and inspection, and if the board grants the appeal, no civil violation will be found and no fines shall be issued. (l) A written extension of time may be granted by the city for any requirement under this section. The city's failure or refusal to grant an extension is not appealable to the board of license and inspection.

(Ord. No. 23-027(sub 1), § 1, 7-6-23; Ord. No. 24-011, § 1, 7-11-24)

Ask a question about Wilmington law

Corpus searches the Wilmington sections it holds and shows the ones that match, with their citations. Free, no sign-in.