§ 89.380 — Prerequisites to permit
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 89.380
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/e9ae3fd9-29b9-45ae-acc9-095852ddebda
89.380. - Prerequisites to permit.
No permits shall be issued for the moving of any building until satisfactory evidence is provided that all utility bills, taxes, and other services for the property have been paid, and that all utility connections have been properly disconnected and removed. In addition, the following shall apply before any permits will be issued: (1) No permit shall be issued as herein provided for the removal of any building until satisfactory evidence is furnished by the city engineer that all sewer charges and water bills chargeable against the property sought to be moved have been paid, and that all sewer and water connections have been plugged or discontinued at the curb line or at the main, as shall be determined by the city engineer, and that satisfactory evidence is presented of the payment of all taxes chargeable against such property. No permit shall be issued until satisfactory evidence is furnished that all public utility companies furnishing services to the premises have been notified in writing by the building mover not less than two (2) business days prior to the raising, holding or moving of the building. The public utility company shall remove its equipment and service within the time set forth in such written notice or promptly notify the building mover and the building official if a longer time period is necessary to remove their equipment and service so as not to constitute a hazard. The building official then may withhold the issuance of the permit when in the city's opinion a longer time period is necessary for the removal of utility equipment and service so as to protect the public health, safety and welfare. (2) However, in lieu of evidence of payment of taxes, the building official may accept a certificate from the State of Minnesota, any of its agencies or political subdivisions, or a body public and corporate, that it is the owner of such property, and that such moving is being done by it, its contractor or agent. (3) Further, no permit shall be issued as herein provided for the moving of any building until satisfactory evidence is furnished by a certificate from the commissioner of health that a licensed pest control company has satisfactorily exterminated all nuisance pests from the structure and premises. (4) Further, no permit shall be issued as herein provided for the moving of any building until satisfactory evidence is furnished in writing that said move or moving has approval of the heritage preservation commission as established in Chapter 34 of this Code. (5) Further, no moving permit shall be issued as herein provided for the moving of any building until satisfactory evidence is furnished in writing from the owner that all remaining foundation walls, footings, columns, floor slabs, piping, heating equipment, fuel storage tanks, and other debris shall be removed from the premises. The excavation remaining after the moving of a building or structure shall be filled to the level of the surrounding grade, with clean, granular-type fill material. Further, this shall be properly compacted and graded to provide drainage to prevent ponding of water. There shall be a topping of a sufficient depth and quality so as to enable groundcover to grow. Suitable groundcover shall be provided no later than ninety (90) days after permit issuance to comply with section 244.1570. Fencing not less than four (4) feet high shall be placed entirely around the perimeter of the excavation if it is more than thirty (30) inches deep at any point. (6) Further, no permit shall be issued as herein provided for the moving of any building to a site within the city unless application has also been made by the owner of such building for a certificate of code compliance, as set out in Chapter 87, Article II of this Code, to be performed when the building has been placed on its new site. New construction standards of the state building code shall apply to the construction, alteration, repair or rehabilitation necessitated by such inspection for any building moved to a site within the city. No such building shall be used for human occupancy until the certificate of code compliance relating to that building has been issued. (7) As a condition of the issuance of any permits, including the permit for moving required by this chapter, the applicant must deposit with the building official two thousand dollars ($2,000.00) in cash or negotiable instrument. Such monies shall be deposited with the city treasurer to be held without interest until such time as said monies are refunded to the applicant or forfeited to the city in the event that the work required by this subsection and a certificate of code compliance is not issued within six (6) months from the date of the code compliance inspection. One (1) three-month extension beyond the initial six-month time limitation may be requested by the owner if it can be shown that the code compliance work is proceeding expeditiously and is more than fifty (50) percent complete, or if unforeseen conditions have had a significant schedule impact on the completion of the work. In the event the building is restored to habitable condition and a certificate of code compliance is obtained within the time limits set out herein, the two thousand dollar ($2,000.00) cash deposit shall be refunded to the payee by the Minneapolis city finance officer. Rehabilitation undertaken by the community planning and economic development (CPED) department or under its sponsorship shall be exempt from the requirement of a cash deposit. (Ord. No. 2019-034, § 1, 8-23-19)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.