Excavation and backfill.
Gulfport Code of Ordinances § 7-257
in effectSec. 7-257. - Excavation and backfill.
(1) [Construction methods.] Methods of construction for excavation and backfill shall be in accordance with the standard specifications for road and bridge construction as adopted by the Mississippi Department of Transportation or construction standards for the city as determined by the city engineer, whichever is stricter or more stringent, and such provisions as are included herein and as may be added in the special conditions. No opening or excavation off a cross trench shall extend beyond the centerline of the road before being backfilled, compacted and the surface of the roadway temporarily restored. All trenches will be backfilled in six-inch lifts and compacted with vibratory mechanical compaction. No excavation shall take place unless the mechanical vibratory compactor is actually on the site. All utility facilities shall be located sufficiently ahead of trench excavation work to avoid damage of those facilities and to permit their relocation, if necessary. Storm drains, pipe culverts or other facilities encountered shall be adequately protected by the permittee. If the work performed interferes with the established drainage system of any street, road, or alley, adequate provision shall be made by the permittee to provide proper drainage during construction and to restore the existing system, all to the satisfaction of the city engineer or his or her designee. No dewatering equipment, wells, points, or piping shall occupy the traveled portion of roadways unless specifically approved and adequately protected to the satisfaction of the city engineer or his or her designee. Effluent from dewatering systems shall be discharged in such a manner that erodible soils are not adversely affected. All silt sediments being carried in the dewatering effluent must be intercepted prior to effluent discharge into any drainage system through use of a sedimentation basin designed to allow retention of discharge for sufficient time to render such waters free of suspended silt and sediments. The use of screening devices in lieu of sedimentation basin must receive specific approval from the city engineer or his or her designee and be employed only for minor flows. Any gravel, earth or other excavated material which is caused to roll, flow, or wash upon any road shall be removed from the roadway after deposit and such removal shall not occur more than twenty-four (24) hours therefrom. In the event the earth, gravel or other excavated material so deposited is not removed, the city or another on behalf of the city may remove the material and any and all costs incurred shall be paid by the permittee or applied from his or her bond. The permittee shall employ construction methods and rests that will keep flying dust to the minimum to the satisfaction of the city engineer or his or her designee. At the first sign of precipitation, all work on the shoulders and traveled way of streets and alleys shall stop and they shall be cleared of all dirt, gravel, and loose materials and the area backfilled until the weather permits resumption of work.
(2) Backfilling. Before backfilling of any cuts, trenches, or openings in streets, roads, or rights-of-way, the permittee shall request an inspection by the city engineer or his or her designee. All backfill material will be free from cinders, ashes, refuse, vegetable or organic matter, boulders, rocks or stones, wet material, or other materials which renders same unsuitable to obtain a firm and compact cover for the installed pipe. The backfill shall be placed in layers not to exceed six (6) inches and each layer shall be thoroughly compacted to not less than ninety-five (95) percent of the maximum dry density as defined by a Standard Proctor Test. Flowable fill will be substituted for compacted back-fill when directed by the city engineer or his or her designee. A Standard Proctor Test (ASTM D698) shall be conducted by an independent soil testing firm and the results given to the city engineer or his or her designee. The cost of this test shall be borne by the permittee or the person, firm, or corporation doing the backfill.
(Ord. No. 2644, § 2-8, 9-22-09)
Source: City of Gulfport, Mississippi, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/ms/gulfport/codes/code_of_ordinances?nodeId=PTIICOOR_CH7OFMIPR_ARTVISTTRRI-WMA_S7-257EXBAFetched: 11/1/2026