Section 300. - Definition—Scope and permit.

A. Infrastructure development process. The development process contemplated herein, which shall include but not be limited to such activities as business parks, retail stores, manufacturing facilities, infrastructure construction or residential development and other similar projects, all of which require designs by a licensed professional engineer, shall require an IDP Major or Minor Construction permit. Integral to the completion of such projects are activities related to stormwater drainage, sanitary sewer, water main extensions, easements and rights-of-way, traffic and transportation and others. This process shall include the following stages: 1. A pre-development conference at the initiation of the project, which is optional. 2. Zoning and platting, which shall be conducted in compliance with the City Zoning Code and Subdivision Regulations. 3. Completion of the infrastructure development process, which shall include a developer's contract, engineer's and contractor's annual contracts, project design by a licensed professional engineer, plan review and approval by the City of Tulsa and issuance of permits for site development and building construction. 4. The construction process, which shall consist of a pre-work conference, construction of the infrastructure, inspection and testing, substantial completion certification by the City of Tulsa, maintenance period and formal acceptance by the City of Tulsa. B. Permit. An IDP Major or Minor Construction permit shall be issued to the applicant only after: 1. Approval of the application; 2. Execution and submission of the engineer's annual contract; of the contractor's annual contract; and the developer's contract; 3. Approval of the required bonds, insurance policies and licenses; 4. Filing of all necessary documentation with the City Clerk; 5. The payment of fees as provided in Title 49, Tulsa Revised Ordinances; 6. Approval by the director of the plans, profiles and specifications applicable to the project within the preceding twelve (12) months. C. Content and posting of permit. The permit shall state the name of the person, firm or corporation to whom it is issued; the name of the owner for whom the project is being constructed; a description of the improvements authorized; the location of the improvements authorized; the length of time in calendar days the permit shall remain in effect and that issuance and validity are conditioned upon acceptance and compliance with the provisions of this chapter. At all times during the duration of the permit, a copy of the permit shall be posted in a conspicuous public place at or near the location of the work.

(Ord. No. 22845, § 1, 3-14-2013; Ord. No. 25606, § 5, 6-18-2025)