§ 154-67.1 — Rates associated with private water main and fire hydrant installation
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 154-67.1
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/ea9894f1-6372-401f-8a72-f3c6a9cfcee4
Sec. 154-67.1. - Rates associated with private water main and fire hydrant installation.
(a) The nonrefundable fee of $1,000.00 is due at the time of application to cover the initial review of all private water main and fire hydrant installation design proposals. The total cost for design review, inspection, testing, chlorination, and engineering and documentation shall be determined according to the schedule set forth in subsection (b) and shall be paid at the time of the pre-construction conference. (b) The charges for chlorination, inspection, and testing the associated documentation shall be according to the established table for a minimum of 500 feet of ductile iron pipe to be installed according to the design criteria of the department of watershed management. RATES ASSOCIATED WITH PRIVATE WATER MAIN AND FIRE HYDRANT INSTALLATION TABLE OF COSTS PER 500 FEET (MINIMUM) LENGTH OF PIPE TO BE INSTALLED FROM MAIN COCK TO MAIN COCK: Water Main Size | 8" | 12" | 16" | 20" | 24" Review | $1,590.00 | $2,170.00 | $2,515.00 | $3,950.00 | $4,415.00 Inspection & Testing | 955.00 | 1,300.00 | 1,510.00 | 2,370.00 | 2,650.00 Chlorination | 285.00 | 500.00 | 640.00 | 850.00 | 1,135.00 Engineering & Documentation | 320.00 | 435.00 | 505.00 | 790.00 | 885.00 Total | 3,150.00 | 4,405.00 | 5,170.00 | 7,960.00 | 9,085.00 TABLE OF COSTS PER 500 FEET (MINIMUM) LENGTH OF PIPE TO BE INSTALLED FROM MAIN COCK TO FIRE HYDRANT: Water Main Size | 8" | 12" | 16" | 20" | 24" Review | $1,590.00 | $2,170.00 | $2,515.00 | $3,950.00 | $4,415.00 Inspection & Testing | 955.00 | 1,300.00 | 1,510.00 | 2,370.00 | 2,650.00 Chlorination | 215.00 | 320.00 | 465.00 | 640.00 | 815.00 Engineering & Documentation | 320.00 | 435.00 | 505.00 | 790.00 | 885.00 Total | 3,080.00 | 4,225.00 | 4,995.00 | 7,750.00 | 8,765.00 (c) All fees are due and payable not less than 15 working days prior to commencement of actual construction.
(Ord. No. 1996-61, §§ 1—3, 8-26-96; Ord. No. 2005-01, §§ 11, 12(Att. D), 1-10-05; Ord. No. 2006-53, § 25, 8-29-06)