For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 40-371 — Administration and schedule of permit fees

Houston Code of Ordinances (Supp. No. 93, Update 2: codified through Ordinance No. 2026-0732, adopted Aug. 19, 2026) · Houston Code of Ordinances § 40-371

Corpus is an independent public-information project, not the official City of Houston website. Stable reference: corpuslaw.us/code/eb035b6f-aefa-4291-8ddb-8497a7f687eb

Sec. 40-371. - Administration and schedule of permit fees.

The traffic engineer shall issue and administer permits. The schedule of fees established pursuant to this section shall be applicable initially to the permits authorized to be issued pursuant to this article. The Director of Houston Public Works shall determine annually in connection with the city's fiscal year whether an increase or decrease in these fees is required for the sidewalk and roadway obstructions and impairments permit program, based on an analysis of the actual costs of administering and enforcing this program, and is hereby authorized to make adjustments annually to the schedule of fees. If the fee is increased, it may be increased only by the documented additional cost to administer and enforce this program. The traffic engineer shall not issue any permit unless and until the applicable fee has been paid, unless the applicant is exempt from paying a fee under city contract, including the "Adopt a Container" program, franchise agreement, or federal, state or local statutes or other applicable laws. Weekly fees shall not be prorated for obstructions lasting less than a full week. Persons who desire to obtain permits shall be charged a fee under the following conditions: (1) For an impairment or obstruction of a roadway or sidewalk, the permit holder shall pay, on a weekly basis only, the applicable fee as shown in the city fee schedule. Fees are based upon single lane closures of up to one week in duration. Multiple lane closure fees are assessed separately. Each hundred block or portion thereof (for instance the 100 block, the 200 block, etc.) constitutes a full hundred-block closure. (2) Work areas include transition areas, activity areas, and termination areas as defined in the latest edition of Texas Manual of Uniform Traffic Control Devices. (3) A utility or public employee may apply for a general permit. A general permit may be used for all street obstructions except as defined below (or defined as an emergency): a. Obstructions may not be performed during peak traffic hours in the CBD and other high vehicle occupancy and transit corridors; b. Obstructions may not reduce lane usage to less than two driving lanes in the CBD during off peak traffic hours; c. Outside the CBD during off peak hours, obstructions may not reduce lane usage to less than one lane in each direction on roadways with four or more lanes, and not less than one lane on two-lane roadways; d. Obstructions may not occur in conflict with special events or parades; e. Sidewalk impairments in the CBD may not be performed under a general permit. (4) Any fees or revenues generated by roadway obstruction or sidewalk impairments covered under this article shall be distributed as follows: a. 85 percent of all fees and revenues shall be allocated to the transportation special revenue fund administered by the Houston Public Works; b. 15 percent of all fees and revenues shall be allocated to the police special services fund administered by the police department.

(Ord. No. 04-498, § 2, 5-26-04; Ord. No. 09-1237, §§ 9, 10, 12-9-09, eff. 1-1-10; Ord. No. 2011-1168, § 13, 12-14-2011; Ord. No. 2018-11, §§ 49, 50, 1-10-2018)

Ask a question about Houston law

Corpus searches the Houston sections it holds and shows the ones that match, with their citations. Free, no sign-in.