Project segmentation prohibition.
R.I. Gen. Laws § 39-26.6-9
in effect39-26.6-9. Project segmentation prohibition.
In no case may a project developer be allowed to segment a distributed-generation
project on the same parcel or contiguous parcels into smaller-sized projects in order
to fall under a smaller-size project classification. Notwithstanding this prohibition,
a project developer may designate a generation unit on the same parcel or contiguous
parcel for net metering or other means of participating in electricity markets, provided
that the unit, or portion of the unit, designated for net metering or other market
participation is not receiving performance-based incentives under this chapter; is
capable of being segregated electrically; is configured with the electrical segregation;
and is separately metered. Further, a project shall not be considered to have been
segmented if:
(1) There is a lapse of at least twenty-four (24) months between: (i) The commencement
of construction of new distributed-generation units on a parcel that is the same as,
or is contiguous with, a parcel upon which a distributed-generation project has already
been constructed; and (ii) The operation date of the preexisting project; or
(2) The new project is a different renewable technology.
P.L. 2014, ch. 200, § 1; P.L. 2014, ch. 216, § 1.
Source: State of Rhode Island General Assembly (rilegislature.gov)URL: https://webserver.rilegislature.gov/Statutes/TITLE39/39-26.6/39-26.6-9.htmFetched: 10/20/2026