§ 118-209 — Monitoring and reporting requirement
Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 118-209
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/ec82b0b0-6970-4f2f-a678-0a1d66ac3e2a
Sec. 118-209. - Monitoring and reporting requirement.
(a) Discharge reports. (1) Every significant industrial user shall file a periodic discharge report at such intervals as are designated by the general manager. The general manager may require any other industrial users discharging or proposing to discharge into the POTW to file such periodic reports. a. Discharge report format shall be pre-approved by board and is subject to change by the board. Two paper copies and one electronic copy (in board approved format) are required to be submitted by the industrial user. (2) The discharge report shall include but shall not be limited to nature of process, volume, rates of flow, mass emission rate, production quantities, hours of operation, concentrations of controlled pollutants or other information which relates to the generation of waste. Such reports may also include the chemical constituents and quantity of liquid materials stored on site even though they are not normally discharged. In addition to discharge reports, the general manager may require information in the form of industrial user discharge permit applications and self-monitoring reports. a. In cases where the pretreatment standard requires compliance with a bmp or pollution prevention alternative, the user must submit documentation required by the board or the pretreatment standard necessary to determine the compliance status of the industrial user. (3) The discharge report shall be accompanied by the certification statement set forth in section 118-207(c). The certification statement shall be signed by the appropriate individual as described in section 118-207(c). (b) Records and monitoring. (1) All industrial users who discharge or propose to discharge wastewater into the POTW shall maintain such records of production and related factors, effluent flows, and pollutant amounts of concentrations as are necessary to demonstrate compliance with the requirements of this article and any applicable state or federal pretreatment standards or requirements, and any BMPs based on any categorical standards. Such records shall be available to the public without restriction. Any request for confidential treatment of information and for access to such information shall be governed by procedures specified in 40 CFR 2. (2) Such records shall be made available upon request by the general manager. All such records relating to compliance with pretreatment standards shall be made available to officials of the EPA and the WVDEP upon demand. A summary of such data indicating the industrial user's compliance with this division shall be prepared and submitted quarterly to the board. (3) The owner or operator of any premises or facility discharging industrial wastewater into the POTW shall install at her/his own cost and expense suitable monitoring equipment to facilitate the accurate observation, sampling and measurement of wastes. Such equipment shall: a. Be pre-approved by the board. b. Be located where approved by the board. c. Be maintained by the industrial user in proper working order and kept secure, but accessible to the board at all times. d. Be calibrated and certified by a manufacturer's authorized third party to the user and board, on a routine basis, as determined by the manufacturer's guidelines or at least once per year, whichever frequency is less. The industrial user will observe the calibration and shall receive a copy of the calibration/certification report. (4) The monitoring equipment shall be located and maintained on the industrial user's premises outside of the building. When such a location would be impractical or cause undue hardship on the industrial user, the board may allow the equipment to be constructed in the public street or sidewalk area, with the approval of the public agency having jurisdiction over such street or sidewalk, and located so that it will not be obstructed by public utilities, landscaping or parked vehicles. (5) When more than one industrial user can discharge into a common sewer the board may require installation of separate monitoring equipment for each industrial user. When there is a significant difference in wastewater constituents and characteristics produced by different operations of a single industrial user, the board may require that separate monitoring facilities be installed for each separate discharge. (6) Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the board's requirements and all applicable construction standards and specifications. (c) Inspection, sampling and analysis. (1) Compliance determination. Compliance determinations with respect to section 118-203 may be made on the basis of either instantaneous grab samples or composite samples of wastewater, as determined by the general manager. a. Except as indicated in subsections b and c below, the industrial user must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite is authorized by the board. Where time-proportional composite sampling or grab sampling is authorized by the board, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to the analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or in the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the board, as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits. b. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. c. For sampling required in support of baseline monitoring and 90-day compliance reports, a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historical sampling data are available, the board may authorize a lower minimum. For the reports required by section 118-209(a) or 40 CFR 403.12(e) and 403.12(h), the industrial user is required to collect the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. d. All wastewater samples must be representative of the industrial user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. Failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. (2) Analysis of industrial wastewaters. Monitoring of pollutants and laboratory analysis of industrial wastewater samples shall be performed in accordance with 40 CFR 136. Analysis of those pollutants not covered by these publications shall be performed in accordance with procedures established by the general manager of the board and the WVDEP. (3) Sampling frequency. Sampling of industrial wastewater for the purpose of compliance determination with respect to section 118-203 will be done at such intervals as the board may designate. However, it is the intention of the board to conduct compliance sampling or to cause such sampling to be conducted for all major contributing industries at least once every year. (d) Reports of changed conditions. Each user must notify the board of any significant changes to the industrial user's operations or system which might alter the nature, quality, or volume of its wastewater at least 90-calendar days before the change. (1) The board may require the industrial user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of an industrial user discharge permit application under section 118-207. (2) The board may issue an industrial user discharge permit under section 118-207 of this division or modify an existing industrial user discharge permit under section 118-208(e) of this division in response to changed conditions or anticipated changed conditions. (e) Reports of potential problems. (1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a slug discharge or slug load, that might cause potential problems for the POTW, the industrial user shall immediately telephone and notify the board of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the industrial user. (2) Within five calendar days following such discharge, the industrial user shall, unless waived by the board, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property, nor shall such notification relieve the industrial user of any fines, penalties, or other liability which may be imposed pursuant to this division. (3) A notice shall be permanently posted on the industrial user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in (1), above. Employers shall ensure that all employees, who could cause such a discharge to occur, are advised of the emergency notification procedure. (f) Reports of unpermitted users. All industrial users not required to obtain an industrial user discharge permit shall provide appropriate reports to the board as the board may require. (g) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the industrial user must notify the board within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the board within 30 calendar days after becoming aware of the violation. (h) Date of receipt of reports. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the board's date of receipt of the report shall govern. (i) Record/keeping. Industrial users subject to the reporting requirements of this division shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this division, any additional records of information obtained pursuant to monitoring activities undertaken by the industrial user independent of such requirements, and documentation associated with BMPs. Records shall include the date, exact place, methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the industrial user or the board, or where the industrial user has been specifically notified of a longer retention period by the board.
(Ord. No. 7596, 9-16-2013)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
