Sec. 6-61. - Inspections generally.

(a) Notice to building inspector of beginning of work. The building inspector shall be notified immediately upon the beginning of the construction, alteration, repair or removal of any building for which a permit is required. He/she/they shall be notified not less than twenty-four (24) hours before the beginning of the demolition of any building. (b) When to call for inspection. (1) Location and footing inspection: After all trenches are excavated, all grade stakes are installed, all reinforcing steel and supports are in place and braced before pouring or placement of any concrete. The property lines must be established, or if there is any question as to the location of the building on the property, the builder will furnish a survey made by a licensed surveyor. (2) Under-slab inspection: If applicable, shall be made after all materials and equipment to be concealed by the concrete slab are installed. (3) Foundation and crawl space inspection: After all foundation supports are installed to check foundation supports, crawl space leveling, ground clearances and positive drainage when required. (4) Rough-in inspection: When all building framing, electrical, plumbing, mechanical, or fire protection systems that will be hidden from view in the finished building have been installed and before wall, ceiling finish, or building insulation is installed. (5) Building framing inspection: After the roof (excluding permanent roof covering), wall, ceiling, and floor framing is installed with appropriate blocking, bracing, and firestopping installed. The following items shall be installed and visible for inspection: (a) Pipes; (b) Chimneys and vents; (c) Flashing for roofs, chimneys, and wall openings; (d) Lintels required to be bolted to the framing for support, and shall not be covered by any exterior or interior wall or ceiling finish material before approval. (6) Insulation inspection: After approved building framing inspection, approved rough-in inspection, and permanent roof covering is installed but before any wall or ceiling covering is installed. (7) Final inspection: After completion of the work authorized under the technical code for each trade. The final plumbing, electrical, mechanical, and fire inspections must be approved before the final building inspection will be made.

(Code 1961, § 24-12; Ord. No. 16-82, § 5, 8-1-16; Ord. No. 20-163, § 3, 12-15-20)