§ 13.04.2005 — City Planned Unit Developments (PUD)
Spokane Municipal Code; partial · SMC 13.04.2005 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/ed0d7e76-4242-4487-ad2b-548913c7248c
Section 13.04.2005 City Planned Unit Developments (PUD)
A. Basic Charge.
In general, a planned unit development (PUD) designation is one approved in accord with applicable PUD development standards and served by a master water meter. However, if a dwelling unit would otherwise be included within a PUD designation but has its own individual City water meter, it will be billed as a single-family residence under SMC 13.04.2002 or other applicable rate section. Questions of applicability are determined by the Water Director. [Cross Reference: SMC 17A.020.160(X)]
B. Consumption.
For billing water consumption, the PUD will be charged the same as a single-family residence within the City limits except the PUD’s total consumption will be calculated by multiplying the number of residential units by the maximum amount on each tier to get a new maximum usage allotted for each tier (for example, tier 1 is 0-600cf, a PUD of 12 homes would get 7200cf at tier 1 for purposes of applying the rate steps defined in SMC 13.04.2002(B).
C. Size of Service / Meter Charge Per Month.  D. Capital Charge.
In addition to the basic charge and consumption charge, there shall be charged a capital charge for all accounts as established and provided for in SMC 13.035.500.
Date Passed: Monday, December 8, 2025 Effective Date: Sunday, January 18, 2026 ORD C36777 Section 3
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.
