§ 118-207 — Industrial user discharge permit application
Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 118-207
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/ed200910-a065-497c-b6a5-ddbab56018f8
Sec. 118-207. - Industrial user discharge permit application.
(a) In order to be considered for an industrial user discharge permit, all industrial users required to have a permit must submit the following information on an application form approved by the general manager: (1) Name, address and location (if different from the address). (2) Standard Industrial Classification (SIC) code of both the industry as a whole and any processes for which federal categorical standards have been promulgated. (3) Wastewater constituents and characteristics including any pollutants in the discharge which are limited by any federal, state or local standards. Sampling and analysis will be undertaken in accordance with 40 CFR 136. (4) Time and duration of the discharge. (5) Daily maximum, daily average and monthly average wastewater flow rates, including daily, monthly and seasonal variations if any. (6) Description of activities, facilities and plant processes on the premises, including a list of all raw material and chemicals used at the facility which are or could accidentally or intentionally be discharged to the POTW. (7) The site plans, floor plans, and mechanical and plumbing plans and details to show all sewers, floor drains and appurtenances by size, location and elevation. (8) Each product produced by type, amount, process and rate of production. (9) Type and amount of raw materials processed (average and maximum per day). (10) Number and type of employees, hours of operation, and proposed or actual hours of operation of the pretreatment system. (11) An assessment of the applicability of federal categorical pretreatment standards to discharges from the user. (12) A statement indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is necessary for the user to meet pretreatment standards. (13) If additional O&M and/or additional pretreatment is required for the user to meet pretreatment standards, the user shall establish the shortest time schedule necessary to accomplish corrective actions. The completion date in this section shall not be longer than the compliance date established by any applicable categorical pretreatment standard. (14) Any other information as may be deemed by the general manager to be necessary to evaluate the permit application. (b) All plans required in subsection (a) of this section must be certified for accuracy by a West Virginia registered professional engineer. (c) All applications must contain the following certification statement and be signed in accordance with subsection (c)(1), (2), (3) or (4) below: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the Person or Persons who manage the system, or those Persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." (1) By a responsible corporate officer if the industrial user submitting the reports is a corporation. For the purpose of this subsection, a responsible corporate officer means: a. A president, secretary, treasurer or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or b. The manager of one or more manufacturing, production or operation facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25,000,000.00 (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. (2) By a general partner or proprietor if the industrial user submitting the reports is a partnership or sole proprietorship respectively. (3) The principal executive officer or director having responsibility for the overall operation of the discharging facility if the industrial user submitting the reports is a federal, state or local governmental entity or their agents. (4) By a duly authorized representative of the individual designated in subsection (c)(1), (2) or (3) of this section if: a. The authorization is made in writing by the individual described in subsection (c)(1), (2) or (3) of this section; b. The authorization specifies either an individual or a position having responsibility from which overall operation of the facility from which the discharge originates, such as the position of plant manager, operator of a well, or wellfield superintendent, or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company; and c. The written authorization is submitted to the board. (5) If an authorization under subsection (c)(4) of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new authorization satisfying the requirements of subsection (c)(4) of this section must be submitted to the board prior to or together with any reports to be signed by an authorized representative. (d) The general manager will evaluate the data furnished by the industrial user and any required additional information. After evaluation of the data furnished, the general manager may issue an industrial user discharge permit subject to terms and conditions provided in this article. (e) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.
(Ord. No. 7596, 9-16-2013)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
