Maintenance of city rights-of-way.
Cape Coral Land Development Code § 5.1.10
in effectSection 5.1.10. - Maintenance of city rights-of-way.
All property owners shall be responsible to either maintain or construct the city-owned right-of-way lying between their property boundaries and the city pavement, to include the following standards.
A. Prior to preparation of a building lot for construction, the building permit holder shall obtain the correct swale flow line elevations from the City and proceed immediately to create the required swale needed to allow continuous uninterrupted flow of stormwater throughout the construction process.
B. During construction or reconstruction approved erosion control devices shall be placed in the swale adjacent to both property lines to impede all foreign matter from entering the stormwater system. The erosion control devices shall remain in place until placement of final sod in the right-of-way.
C. No excavated material or construction material shall restrict stormwater flow within the swale area.
D. Upon issuance of the certificate of occupancy, the owner shall maintain the swale indefinitely to the same standard that is applied to privately-owned property.
E. All pavement damage must be repaired to meet or exceed the City of Cape Coral Engineering Design Standards.
Source: City of Cape Coral, Florida, Code of Ordinances, City Charter and Land Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/fl/cape_coral/codes/code_of_ordinances?nodeId=ART5DEST_CH1GEREALDE_S5.1.10MARI-WFetched: 11/4/2026