Baseline monitoring reports.
Kansas City Code § 60-152
in effectSec. 60-152. - Baseline monitoring reports.
When required by the director, by section 60-141 or by 40 CFR 403.12, Industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report which contains the following information:
(1) Identifying information. The name and address of the facility, including the name of the operator and owners and the name and title of the authorized representative.
(2) Environmental control permits. A list of any environmental control or wastewater discharge permits or authorizations held by or for the facility.
(3) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by the industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from regulated processes, and storage areas for raw materials and hazardous waste.
(4) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated processes and other sources as necessary to allow use of the combined wastestream formula.
(5) Measurement of pollutants.
a. The categorical pretreatment standards applicable to each regulated process.
b. The results of sampling and analysis identifying the concentration of each regulated pollutant in the effluent from each regulated process. Where required by the pretreatment standard or the director, the mass of each regulated pollutant in the effluent from each regulated process and the production rate of each regulated process shall also be reported. Samples shall be representative of daily operations and shall be collected and analyzed in accordance with procedures set forth in 40 CFR Part 136 and shall be collected in such number and otherwise in accordance with 40 CFR 403.12(b)(v). The industrial user shall provide estimates of the anticipated flow and quantity of pollutants where actual data cannot be obtained.
c. The time, date and place of sampling shall be reported for each sample.
(6) Certification. A statement by the industrial user's authorized representative certifying that the sampling results submitted are representative of normal work cycles and expected effluents and indicating whether pretreatment standards are being met on a consistent basis and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. An industrial user which has not begun discharge to the POTW shall include a description of any pretreatment process or processes it intends to use to meet applicable pretreatment standards.
(7) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the industrial user shall report the shortest schedule for providing such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in section 60-153 of this article.
(8) Signatory requirements. All baseline monitoring reports must be signed and certified in accordance with section 60-160
(Ord. No. 120551, § 1, 6-28-12)
Source: City of Kansas City, Missouri, Code of Ordinances, Charter and Zoning and Development Code (Municode Library, library.municode.com)URL: https://library.municode.com/mo/kansas_city/codes/code_of_ordinances?nodeId=COORKAMIVOII_CH60SESEDI_ARTIVCOINWA_DIV5RERE_S60-152BAMOREFetched: 10/28/2026
