§ 25-152 — Wastewater Pretreatment; pretreatment required
Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 25-152
Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/ee269096-358c-4600-a41f-cb2a4c19c057
Sec. 25-152. Wastewater Pretreatment; pretreatment required.
(a) All Users are required to properly operate and maintain all pretreatment equipment and processes in a manner that will provide for the effective pretreatment of wastes. All Users have a duty to halt and/or reduce, to the extent possible, any discharge that has the potential to cause either Pass-Through or Interference with the operation of the POTW. Users shall provide necessary wastewater treatment as required to comply with this Code, and shall achieve compliance with all Federal Categorical Pretreatment Standards, Local Limits, and all other applicable Federal, State, and local requirements within the time limitations as specified by the EPA, ADEQ, or the Director, whichever is more stringent. Any facilities required to pre-treat wastewater to a level acceptable by the Director shall be provided, operated and maintained at the User's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the Director for review, and shall be acceptable to the Director before construction of the facility. The review of such plans and operating procedures will in no way relieve the User from the responsibility of modifying the facility as necessary to produce a discharge acceptable to the City under the provisions of this Code. Any subsequent changes in the pretreatment facility or method of operation shall be reported to and be approved in writing by the Director prior to the initiation of the changes. (b) The City shall annually publish in any newspaper of general circulation within the City a list of the Users found in noncompliance with any Pretreatment Requirements or Standards at least once during the twelve (12) previous months. The notification shall also summarize any enforcement action taken against the User(s) during the same twelve (12) months. (c) Whenever deemed necessary, the Director may require Users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the POTW and determine the User's compliance with the requirements of the pretreatment provisions of this Chapter. (d) The Director may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. An individual wastewater discharge permit may be issued solely for flow equalization. (e) Grease, oil, sand and lint interceptors shall be provided when, in the opinion of the Director, they are necessary for the proper handling of wastewater containing excessive amounts of grease and oil, sand, lint or other objectionable material; except that such interceptors shall not be required for residential Users. All interception units shall be of type and capacity approved by the Director and shall be located so as to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired regularly, as required by Sections 25-174, by the User at their expense. (f) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (Code 1977, § 12-2-6.8; Ord. No. 90-11, 4/10/90; Ord. No. 91-41, 11/12/91; Ord. No. 09-39, 10/20/09, Amended (SUPP 2009-4))
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.
