§ 523.04 — Large Commercial Rate Schedules
Codified Ordinances of the City of Cleveland, Ohio (2026 S-28: current through legislation passed October 19, 2026) · Codified Ordinances of Cleveland § 523.04
Corpus is an independent public-information project, not the official City of Cleveland website. Stable reference: corpuslaw.us/code/ee4e6745-c004-442b-b9dd-29f9c4c1746c
§ 523.04 Large Commercial Rate Schedules
Effective January 1 of each applicable year, the following are applicable to all commercial installations during any month in which such installation has a demand equal to or greater than thirty (30) kilowatts (KWD) and less than ten thousand (10,000) kilowatts (KWD) and a kilowatt hour consumption of less than or equal to five hundred thousand (500,000). Usage charges are not prorated. The charge used will correspond with the bill period end date. (a) Demand Charge. | Summer | Winter Kilowatt Per Month | 2024 | 2025 | 2026 | 2024 | 2025 | 2026 First 50 | $7.99 | $9.17 | $10.02 | $7.28 | $8.35 | $9.13 All over 50 | $6.92 | $7.94 | $8.68 | $6.33 | $7.26 | $7.94 (b) Reactive Charge. | Summer | Winter Kilovar Per Month | 2024 | 2025 | 2026 | 2024 | 2025 | 2026 In excess of 30 | $0.20 | $0.23 | $0.25 | $0.20 | $0.23 | $0.25 (c) Kilowatt Hour Charge. | Summer | Winter Kilowatt Per Month | 2024 | 2025 | 2026 | 2024 | 2025 | 2026 First 40,000 | $0.0331 | $0.0380 | $0.0415 | $0.0288 | $0.0330 | $0.0361 Next 60,000 | $0.0207 | $0.0238 | $0.0260 | $0.0173 | $0.0199 | $0.0217 All over 100,000 | $0.0166 | $0.0190 | $0.0208 | $0.0140 | $0.0161 | $0.0176 (d) Minimum Charge. The monthly minimum charge shall be fifteen dollars and thirty-five cents ($15.35), plus the Power Supply Recovery. (e) Maximum Charge. The monthly maximum charge shall be twenty and one-half cents ($0.205)/KWH, plus the Power Supply Recovery. (f) Definition of Seasonal Rate. For the purpose of this rate schedule, the summer rate shall be in effect during the months of June, July, August, September and October. The winter rate shall be in effect during the months of November, December, January, February, March, April and May. (g) Determination of Demand. The kilowatt demand shall be determined monthly by demand measurements and shall be the maximum thirty (30) minute kilowatt demand during the month. (h) Determination of Reactive Demand. For all three (3) phase installations where the kilowatt demand is sixty-five (65) or greater, and all single-phase installations where the kilowatt demand is seventy-five (75) or greater, the reactive billing demand shall be determined by multiplying the monthly kilowatt demand by the ratio of the monthly lagging reactive kilovolt ampere hours to the monthly kilowatt hours. For all three (3) phase installations where the kilowatt demand is less than sixty-five (65), and all single-phase installations where the kilowatt demand is less than seventy-five (75), the reactive billing demand shall be zero. (i) Discount for Primary Metering. Where the electric energy is metered on the primary (2,300 volts or higher) side of the service transformers, a discount of two percent (2%) of the gross primary metered kilowatt hours may be allowed. (j) Voltage Supply Discount. Where the electric energy is provided entirely from an eleven thousand (11,000) volt circuit, a discount of five cents ($0.05) per kilowatt of demand billed may be allowed. (k) Substation Ownership Discount. A discount of thirty cents ($0.30) per kilowatt of demand billed may be allowed when a customer owns, installs and maintains transformation and substation apparatus, thereby relieving the Division of Cleveland Public Power of these costs. (l) Off-Peak Demand Allowance. At the option of the Division, the billing demand may be the greater of the regularly incurred demand or eighty-five percent (85%) of the maximum demand incurred during off- peak periods. The cost of special metering to determine such demand shall be charged to the customer. Off-peak periods shall be from 12:00 a.m. until 8:00 a.m., Tuesday through Saturday, and from 4:00 p.m. Saturday through 8:00 a.m. Monday. (m) Special Service. Direct current, standby, temporary, special, welding, intermittent or extremely low load and extremely low load factor service is not included in this schedule and shall be subject to special rates based upon cost as computed by the Division of Cleveland Public Power. Applicants for these services may be charged with the cost of installing and furnishing such services as well as the cost of removal of such services at the discretion of the Division. The monthly minimum charge shall be applied in the case of all special services. (n) Combined Billing. Where plural service connections supply a customer on the same premises, meter readings may, at the option of the Division, be added for billing purposes. The combined demand shall be the sum of the undiversified demands computed as for separate billing. (o) Environmental and Ecological Adjustment. An adjustment to the Power Supply Recovery shall be applied to this rate as set forth and described in Section 523.17. (p) Power Supply Recovery. In accordance with Section 523.21, the Power Supply Recovery shall be determined and applied on a monthly basis by the Division. (q) Determination of Applicable Schedule. In any month that the kilowatt demand (KWD) is less than ten thousand (10,000) and the kilowatt hour consumption exceeds five hundred thousand (500,000), the billing for that month shall be calculated using the Small Industrial Rate Schedules set forth in Section 523.043. In any month that the kilowatt demand (KWD) is less than thirty (30), the billing for that month shall be calculated using the Small Commercial Rate Schedule set forth in Section 523.03 (Ord. No. 957-2024. Passed 11-4-24, eff. 11-6-24) (BOC Res. No. 639-24. Adopted 12-18-24)
Ask a question about Cleveland law
Corpus searches the Cleveland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
