For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16-5.02.110 — Inspections

Victorville, California, Municipal Code (Supp. No. 57: codified through Ordinance No. 2466, passed April 7, 2026) · Victorville Municipal Code § 16-5.02.110

Corpus is an independent public-information project, not the official City of Victorville website. Stable reference: corpuslaw.us/code/ef5be480-224c-443c-917b-a9134ef93b83

Sec. 16-5.02.110: - Inspections

(a) Requirements. All construction or work for which a permit is required shall be subject to inspections by authorized employees of the City. The Building Official may require continuous inspection and supervision by a registered civil engineer and other appropriate consultants as a condition for issuing the grading permit. A final inspection shall be made before issuing a grading completion certificate. (b) Exposure of Work. When work which must be inspected is covered without having first been inspected, the Building Official shall require the work to be exposed for examination. The permittee shall bear the cost of exposing and recovering the work. (c) Notices. The permittee shall notify the Building Official twenty-four hours in advance of the following inspections: (1) Initial Inspections. The permittee is ready to begin work but has not done any brushing or grading. (2) Toe Inspections. The base ground is exposed and prepared to receive fill but no fill has been placed. Fill shall not be placed until all debris and unsuitable material have been removed from the site to an approved location. (3) Sub-drain Inspections. Sub-drains are installed but no fill has been placed. (4) Excavation Inspections. The excavation has started but the vertical depth of the excavation is less than ten feet. (5) Fill Inspections. Fill placement has started but the combined vertical height of the fill is less than ten feet. (6) Drainage Device Inspections. The forms, steel reinforcement and pipe are in place but no concrete is placed. (7) Rough Grading. The rough grading has been completed. This inspection may be made even though the Building Official has not reviewed earlier inspection reports. (8) Rough Grading Certification. Once rough grading is completed, the Building Division requires the engineer of record to certify that the rough grading is completed in accordance with the approved plan and that any building pads are constructed as required by the approved plan and geotechnical investigation(s). This certification must be submitted in writing prior to approval of any portion of the foundation and shall indicate that the location, elevation, and compaction all meet the requirements of the approved plans and studies, as well as any special requirements that the engineer of record has stipulated. (9) Final Certification. All work including the installation of drainage structures and other protective devices, the compaction of trench backfill, the planting and slope stabilization have been completed, the engineer of record has certified in writing that improvements are completed as required by the approved plans and geotechnical investigation(s), and all required reports have been submitted. (10) Other Inspections. In addition, the Building Official may make other inspections to ascertain compliance with the provisions of this Chapter and other laws. (11) Interrupted Grading. The permittee shall notify the Building Official twenty-four hours before he is ready to resume grading and before any grading or brushing is started. (d) Certification. When the work is completed, the Building Official shall approve that all grading work has been done in compliance with approved reports and grading plans and that he shall thereafter administer applicable Building Code regulations. (e) Final Reports. When the work is completed, but before issuing a final certificate, the Building Official may require the following reports and information: (1) A report from a registered civil engineer certifying that all grading, lot drainage and drainage facilities have been completed in accordance with the approved plans and the provisions of this Chapter, and that the graded site will support the contemplated structures; (2) A report from a soils engineer including certification of the soil bearing capacity, summaries of field and laboratory tests, lot-by-lot soil expansion rate, location on an "as built" grading plan of each slope test taken in the fill showing the limits of compacted fill and other pertinent information; (3) A report from an engineering geologist based on the final contour map, including specific approval of the grading as affected by geological factors. When necessary, a revised geological map, cross Sections and recommendations shall be included; and (4) A "record" grading plan signed by the supervising civil engineer, the soils engineer and the engineering geologist for their portions of the work.

(Ord. No. 2389, § 3, 3-19-19)

Ask a question about Victorville law

Corpus searches the Victorville sections it holds and shows the ones that match, with their citations. Free, no sign-in.