Advance notice for drawbridge opening.
33 C.F.R. § 117.40
in effectEffective (a) Upon written request by the owner of a drawbridge, the District Commander may authorize a drawbridge to operate under an advance notice for opening. The drawbridge tender, after receiving the advance notice, must open the drawbridge at the requested time and allow for a reasonable delay in arrival of the vessel giving the advance notice.
(b) If the request is approved, a description of the advanced notice for the drawbridge will be added to subpart B of this part.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
