What occurs during the weekly tests and inspections?
33 C.F.R. § 150.512
in effectEffective The required weekly tests and inspections of lifesaving equipment are as follows:
(a) The operator must visually inspect each survival craft, rescue boat, and launching device to ensure its readiness for use;
(b) The operator must test the general alarm system; and
(c) The operator must test for readiness of the engine, starting device, and communications equipment of each lifeboat and rescue boat according to the manufacturer's instructions.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
