For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-69 — Wireless Transmission Facilities

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 10-69

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/ef825a32-b80c-4b65-bbe3-95aa7a898c38

Sec. 10-69. Wireless Transmission Facilities

a. Purposes 1. To provide for broadcasting or reception towers or antennas situated on non-residential sites that are intended for transmitting or receiving television, radio, cellular, or telephone communications. 2. To establish guidelines for the placement of towers and antennas. 3. To encourage the joint use of new and existing tower sites. 4. To balance the need of providers of telecommunications services to provide quick, effective, and efficient service with the safety and welfare of the public pursuant to federal law. b. Required Conditions Any commercial, radio, television, cellular, or microwave towers, reflectors, antennas, or support structures constructed after the effective date of this ordinance (3/26/03) are prohibited in Residential districts, excluding multi-family districts where permitted in this Chapter. c. Special Use Permit and Site Plan Required Broadcasting and communications towers or antennas may not be constructed unless the planning and zoning commission has reviewed, and city council has approved, a Special Use Permit (SUP) and site plan pursuant to Article IX, Division A. d. Procedures Any person wishing to construct a new broadcasting or communication tower/antenna must make application to the planning department for a special use permit. A detailed site plan must be submitted with the SUP application for each tower/antenna location, and must contain the following: 1. Location of proposed tower/antenna, including the zoning and land use of adjacent property. 2. All significant structures within one-half mile of the proposed tower/antenna location. Significant structures include all publicly or privately owned buildings or structures (excluding utility poles) or street or traffic light standards, that are equal to or greater than 20 feet below the requested antenna height. This information will be used to determine where co-location sites exist in lieu of the construction of new towers/antennas. 3. Propagations for the area as provided for the initial site determination (if applicable). 4. Photo or architectural simulation of the proposed tower/antenna development site from adjacent properties and rights-of-way. 5. A detailed landscape/screening plan to include the complete pad site. The landscape/screening plan must be consistent with the design and material of the surrounding properties. Additional requirements as to landscaping, lighting, screening, accessways, driveways, signs, and other like requirements may be imposed by the planning and zoning commission and city council for the protection of adjoining and surrounding properties. 6. Name, address, and telephone number of the person or entity responsible for removal of a tower/antenna in the event of abandonment. Should any of this information change after a SUP has been approved, such updated information must be provided to the planning department within 10 days. 7. Copies of FAA application or approval. 8. Explanation justifying the requested height of the tower/antenna. 9. Written confirmation from owners or authorized agents or structures identified as significant according to subsection d.2 above that details the reason(s) why the proposed tower/antenna cannot be co-located on a significant structure or building. 10. Engineering documents verifying new towers are able to accommodate no less than three but not more than five carriers based on structural data. 11. Adequate land area must be provided to accommodate up to three carriers but no more than five. 12. The application will be placed on the next available meeting of the planning and zoning commission. Any decision by the commission to deny a SUP for a tower or antenna will be in writing and supported by substantial evidence contained in a written record. Pursuant to Article IX, Division A, denial of a SUP may be appealed to the city council. 13. Upon appeal, the application for a SUP for a tower/antenna will be placed on the next scheduled city council meeting designated for hearing zoning matters. The city council must approve or deny the application for the SUP for a tower/antenna no later than 90 days after the original filing with the planning department. If the application is not denied within said 90-day period, then the application will be deemed approved. Any decision by the city council to deny an SUP for a tower/antenna must be in writing and supported by substantial evidence in a written record. e. Administrative Approval for Changes to Existing Towers/Antennas The following broadcasting and communication towers or antennas will not require a Special Use Permit and may be approved by the Planning Director or designee: 1. A Minor Telecommunication Facility Modification subject to the following: a. The applicant must provide a written rationale detailing how the application qualifies as a Minor Telecommunication Facility Modification. The Planning Director must approve or reject the request within 60 days the filing of the request with the planning department. If the application is not denied within the 60-day period, then it will be deemed approved. b. Written record. Any decision by the planning director to deny a request for a change or alteration to a previously permitted tower, antenna, building, or structure must be in writing and supported by substantial evidence contained in a written record. The written decision of denial by the planning director must also indicate that the applicant may appeal, within 10 days, the decision of the planning director to the planning and zoning commission and the city council. In the event of such an appeal, the provisions of Article VIII, Division G herein will govern. c. If the tower or antenna will constitute a Substantial Telecommunications Facility Modification as defined in this Chapter, then an SUP will be required and the provisions of subsection d. will govern. d. All requirements and provisions in subsection d. are provided so that the planning director is able to ensure that all permitted collocation sites adhere to current safety and aesthetic standards. 2. Small Cell communication facilities on private property. The applicant shall submit a preliminary site plan for administrative review and approval by the Planning Director or designee. The applicant shall also submit an application which shall include: (i) photographs or accurate renderings, including correct colors and exact dimensions, of each type of proposed small wireless facility; (ii) a statement signed by a professional engineer licensed in the State of Texas stating that the proposed facilities comply with all applicable Federal Communications Commission regulations and (iii) such additional information as the Planning Director may reasonably require in order to determine whether the requirements of this Section are met. The application and site plan for the Small Cell communication facility shall be approved by the Planning Director only if the following minimum standards are met: a. This subsection does not apply to Small Cells in the public right-of-way. These devices are subject to City Council approval pursuant to City Ordinance and State Law. b. New building-or-structure mounted installations are not permitted inside of a historic district or within 250 feet of the boundary of a historic district; nor shall new installations be located on or within a structure that is designated as a National Historic Landmark or listed or eligible for listing in the National Register. c. Small Cells shall be substantially concealed from view by means of painting or tinting to match the surface of the building or other structure to which they are affixed or by other suitable method, such as by flush-mounting or integration into the design elements of the building or structure. d. Equipment other than whip antennas and electrical power or battery backup cabinets shall not exceed eight (8) cubic feet. Whip antennas shall be no longer than sixty-two (62) inches. e. Electrical power and battery backup cabinets shall, to the extent practicable, be roof-mounted or otherwise located so as not to be visible from a public street or, where not practicable as determined by the Planning Director or designee, such equipment shall be appropriately screened by landscaping or other means minimizing visibility from a public street. f. Small Cells shall be permitted in common areas serving multi-family residential zones (R-MF and PMF) and shall not be permitted in any other residential zones. They shall be permitted in all other non-residential districts with the exception of "AR" and residentially-used "AG" zones. g. Special requirements based on whether Small Cell is affixed to a building, rooftop or pole: a. Building-mounted. i. The Small Cell may be attached to any building which is at least twenty (20) feet in height as measured from the ground level. ii. When attached to such building, the Small Cell shall be affixed at least fourteen (14) feet in height as measured from the ground level and shall not protrude more than two feet above the roofline or from the building facade. b. Rooftop-mounted. i. Rooftop-mounted Small Cells are not permitted on buildings with pitched roofs. ii. Rooftop-mounted Small Cells shall be screened per Section 10-341 of this Chapter. c. Pole-mounted. i. The Small Cell shall be mounted on a pole which supports an athletic field or parking lot light, street light or utility line. Such poles shall be at least fifteen (15) feet in height as measured from the ground level; ii. The Small Cell shall not be more than five (5) feet above the height of the pole on which it is mounted; iii. The Small Cell shall not protrude outward more than two (2) feet from the pole on which it is mounted; iv. The Small Cell must maintain at least a fourteen (14) feet clearance from the bottom of the facility to the ground level below. v. There shall be no more than one (1) Small Cell per pole; h. At such time that the Small Cell communication facility ceases to be used for communications purposes it will be subject to Subsection k. of this Section. i. The Planning Director must approve or reject the request within 60 days the filing of the request with the planning department. If the application is not denied within the 60-day period, then it will be deemed approved. j. Written record. Any decision by the planning director to deny a request for a change or alteration to a previously permitted tower, antenna, building, or structure must be in writing and supported by substantial evidence contained in a written record. The written decision of denial by the planning director must also indicate that the applicant may appeal, within 10 days, the decision of the planning director to the planning and zoning commission and the city council. In the event of such an appeal, the provisions of Article VIII, Division G herein will govern. k. Small Cells not in compliance with the above requirements are not eligible for administrative approval and an SUP will be required and all other provisions of this section will govern. f. Tower/Antenna Height 1. No commercial radio, television, cellular, or microwave reflector tower/antenna or support structure may exceed 150 feet in height. Tower/antenna height is approved as part of the SUP or administrative approval process under this section. 2. Publicly owned towers/antennas will not be subject to maximum height requirements. g. Entire Lot For purposes of determining whether the installation of a tower/antenna complies with district development regulations, setback requirements, and other zoning regulations, the dimensions of the entire lot will control, even though the towers/antennas may be located on portions of such lots. h. Antenna Support Structure 1. Towers/antennas and required accessory buildings located within commercial and industrial zones must comply with the building setbacks for the specific zoning district. 2. A minimum setback for towers/antennas and required accessory buildings equal to the height of the tower/antenna is required from any residential zone boundary line. i. Grandfathered Towers/Antennas Any tower or antenna lawfully existing on March 26, 2003 may continue to exist under the standards existing at the time that the tower/antenna was originally permitted. However, any changes or alterations to such previously permitted towers/antennas constituting a Substantial Telecommunications Facility Modification as defined in this Chapter will be subject to this ordinance. j. Federal Requirements All towers/antennas must meet current standards and regulations of the Federal Aviation Administration (FAA), the Federal Communications Commission (FCC), and any other federal agency having authority to govern towers/antennas. k. Abandoned Towers/Antennas Any tower/antenna that has not been in operation for a continuous period of 12 months will be considered abandoned, and the owner or person in control must remove it within 90 days after receipt of written notice from the city. If such tower/antenna is not removed within 90 days, the city may remove it at the owner's expense. If there are multiple users on a single tower/antenna, the city will not direct the owner or person in control to remove it until all users cease using the tower/antenna. l.. Public towers/antennas All publicly owned antennas or communications structures are be to permitted in any district, provided that a license, lease, or other form of approval has been obtained from the city. (Ord. 0-99-72, 9/22/99) (Ord. No. 0-2003-11, 3/26/03)(Ord. No. 0-2012-83, 10/10/12) (Ord. No. 0-2017-69; 8/23/17)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.