For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.16.1600 — Best Management Practices (BMP's)

Reno Administrative Code, City of Reno, Nevada (Supp. No. 65, Update 1: codified through Ordinance No. 6740, adopted May 6, 2026) · Reno Administrative Code § 12.16.1600

Corpus is an independent public-information project, not the official City of Reno website. Stable reference: corpuslaw.us/code/f0f3b0a9-f784-4f51-ab56-5d4c2066ed88

Sec. 12.16.1600. - Best Management Practices (BMP's).

When it becomes necessary or desirable to discharge into the storm sewer system any matter from any source which does not conform to the requirements outlined in this article, it is required that before such matter may be discharged into the storm sewer system, the producer therefore shall pre-treat same using best management practices (BMP's) to the maximum extent practicable (MEP) at his own expense. Upon written notice from the city of the requirement to utilize best management practices (BMP's), the user shall have ten working days to reply to the public works director as to a plan of compliance and shall be in compliance within 90 days unless a time extension is granted by the city. If analytical procedures are used to determine compliance, it will be those specified in 40 CFR Part 136. Such best management practices (BMP's) may include but are not limited to sedimentation chambers, oil separators, fiber rolls, storm drain catch basin filters, silt fences, secondary containment and any other device which effect a change of any nature in the characteristics of the matter being treated. Any and all such devices and equipment shall not be put into operation without a written permit of approval issued by the public works director and shall be provided with all necessary features of construction to permit inspection of operations and testing of material passing through them, and shall be open to the inspection of the public works director. Any best management practice (BMP) used to pre-treat storm water to the maximum extent practicable (MEP) shall be provided and maintained at the user's expense. Detailed plans showing the best management practices (BMP's) and operating procedures shall be submitted to the public works director for review and shall be approved by the public works director before construction or installation. The review and approval of such plans and operating procedures will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent complying with the provisions of this article. Any subsequent changes in the best management practices (BMP's) or method of operation shall be reported to and be approved by the public works director.

(Ord. No. 5469, § 1, 7-16-03)

Ask a question about Reno law

Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.