Marking with name and date required.
Minneapolis Code of Ordinances § 437.40
in effect437.40. - Marking with name and date required.
Every such principal who lays or constructs any sidewalk, curb or curb and gutter shall stamp or affix thereon his name and the true date, or dates, on which such sidewalk, curb or curb and gutter was laid or constructed. The date of construction so indicated thereon shall be prima facie evidence of the date of the commencement of the two-year maintenance period required of the said principal under the terms of his bond, as required by this chapter. Such name and date, or dates, shall be placed in such sidewalk, curb or curb and gutter in at least one place in every fifty (50) lineal feet thereof, or in one place if a lesser number of feet thereof is constructed. The city engineer shall provide in the specifications for sidewalk, curb or curb and gutter construction the style, size of lettering and manner of stamping or affixing the name and date of construction thereof as herein required. (Code 1960, As Amend., § 575.040)
Source: City of Minneapolis, Minnesota, Code of Ordinances, City Charter and Park and Recreation Board Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/mn/minneapolis/codes/code_of_ordinances?nodeId=MICOOR_TIT17STSI_CH437SICUGUCO_437.40MANADAREFetched: 11/2/2026
