Sec. 7-196. - Deletions, modifications and amendments.
The International Existing Building Code, 2017 edition, Chapter 1—16; as adopted in this division, are deleted, modified and amended as follows:
(1) Amend subsection (A) 101.4.2 to read "The legal occupancy of any building existing on the date of the adoption of this code shall be permitted to continue without change, except as is specifically covered in this code, the International Fire Code, the International Building Code, or the International Residential Code, or as is deemed necessary by the code official for the general safety and welfare of the occupants and the public."
(2) Add subsection 101.4.3 "Maintenance" to read:
"Building and parts thereof shall be maintained in a safe and sanitary condition. All existing devices or safeguards shall be maintained in all buildings. The owner or the owner's designated agent shall be responsible for the maintenance of the building. To determine compliance with this subsection, the code official shall have the authority to require a building to be re-inspected. Except where specifically permitted by this code, the code shall not provide the basis for removal or abrogation of fire protection and safety systems and devices in existing buildings."
(3) Amend subsection (A) 103.1 Creation of enforcement agency. to read "The Department of Building Safety is hereby created and is to be known as The City of Huntsville Inspection Department, and the official in charge shall be known as the Director of Inspection Services. All future references to "the Department of Building Safety' shall mean "the City of Huntsville Department of Inspections". All future references to the "code official" shall mean "the Director of Inspection Services".
Delete subsection (A) 104.2.1 "Determination of substantially improved or substantially damaged existing buildings and structures in flood hazard areas" in its entirety.
Delete subsection (A) 104.10.1 "Flood hazard areas". in its entirety.
(4) Delete subsection 105.1.1 "Annual Permit" in its entirety.
(5) Delete subsection 105.1.2 "Annual Permit Records" in its entirety.
(6) Delete subsection 105.2 "Work Exempt from Permit" in its entirety.
(7) Delete subsection 105.2.2 "Repairs" in its entirety.
(8) Delete subsection 105.2.3 "Public Service Agencies" in its entirety.
(9) Amend subsection (A) 108.3 "Building permit valuations" to read "The applicant for a permit shall provide an estimated permit value, verified by a signed contract submitted at the time of application. Permit valuations shall include total value of work including materials and labor for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and permanent systems. If, in the opinion of the code official, the valuation is underestimated on the application, the permit shall be denied unless the applicant can show detailed estimates to meet the approval of the code official. Final building permit valuation shall be set by the code official."
(10) Delete subsections (A) 109.3.1 through (A) 109.3.6.
Amend subsection (A) 109.3. "Required inspections" to read
BUILDING
(1) Footing Inspections: Inspections are required for setbacks, footing depth and widths, and steel rebar.
(2) Monolithic Slabs: This inspection is to take place after plumbing and electrical inspections if applicable.
(3) Foundation Inspection: Made after grading of crawlspace area, placement of piers, anchor bolts, 4" drain and installation of floor system prior to installing subflooring.
(4) Pre-insulation Inspection: This inspection is to be made when shingles, sheathing, windows and doors are installed. Mechanical, electrical, plumbing, and gas inspections need to be made "if applicable", prior to this inspection. Brick ties should be installed over a moisture impermeable house wrap. When this inspection has passed, brick and insulation may be installed.
(5) Framing Inspection: This inspection is to be made after any framing corrections have taken place and after the building has been insulated. If framing corrections have been made, the framing inspection will be passed, and drywall may be installed.
(6) Temp 30: To obtain power to the structure, an affidavit must be signed by the contractor, permanent building number posted, and building can be locked. Building cannot be occupied until receipt of the Certificate of Occupancy.
(7) Above Ceiling Inspection: This inspection, (typically applicable on commercial projects), is to be done after all trade inspections and is to view ceiling supports, fire caulking of rated walls and penetrations. If acoustical ceiling is not to be used this inspection is still mandatory for fire caulk inspection prior to painting walls.
(8) Final Inspection: When the building has been completed and mechanical, electrical, plumbing, and gas inspections "if applicable" have been completed, you may request the building final inspection.
ELECTRICAL
(1) Slab Inspection: If any electrical lines are installed in the slab or concealed in concrete walls.
(2) Underground: All conduits and direct burial cable placed in the ground must be inspected prior to covering.
(3) Rough-in Inspection: When wires are pulled and stapled prior to installation of sheetrock, "No insulation is to be installed prior to rough-in inspection." All areas of renovations where sheetrock has been removed will also require a rough-in inspection.
(4) Temp 30: The following are required: permanent house numbers, the building is lockable, the meter base and main panel are installed, and a receptacle with GFCI protection.
(5) Final Inspection: When all fixtures, plugs and appliances are installed. All electrical work should be completed at this time.
(6) Electrical Final for HVAC (If separate): Air conditioning final to be made when all electrical lines and disconnects are completed to heat and air units.
MECHANICAL & GAS
(1) Slab: To be made if gas lines or mechanical work is run under or through the slab. Inspection is to be made before the work is covered.
(2) Rough-In Inspection/Wall Rough: When all gas lines and refrigeration lines that are to be concealed are run inside structure prior to insulation and drywall. All ductwork in concealed locations must be inspected prior to installation of drywall.
(3) Above Ceiling Inspection: This inspection, (typically applicable on commercial projects), is to be done after grid is installed and before ceiling tiles are placed. Inspection will verify equipment installation, service clearances, fire dampers, duct work and registers.
(4) Final Inspection: When all gas appliances are installed and completed, and all mechanical work finished. Service clearance area around all indoor and outdoor units must be provided based on code and manufacturer requirements.
PLUMBING
(1) Slab: To be made before gravel and poly are installed over pipes and water lines.
(2) Sewer/Water Lines: To be made before sewer lines and water lines are covered.
(3) Rough-in: To be made when all plumbing pipes are stubbed-out and pressure tested prior to sheetrock being hung. (No insulation is to be installed prior to this inspection.)
(4) 30 Day Temporary: To be made when the sewer and rough ins have been passed. (This inspection must be requested by the plumber.)
(5) Final: To be made when fixtures are set, and plumbing is completed and in working order.
(11) Amend subsection (A) 109.3.8 to be number (A) 109.3.2
(12) Amend subsection (A) 110.1 "Altered area use and occupancy classification change" to read "Altered areas of a building shall not be used or occupied until the code official has issued a notice of completion or certificate of occupancy, as required by the City of Huntsville Inspection Department. Relocated buildings shall not be used or occupied and change in the existing use or occupancy classification of a building or portion thereof shall not be made until the code official has issued a certificate of occupancy therefor as provided herein. Issuance of a notice of completion or certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction."
(13) Delete subsection (A) 110.3 "Temporary occupancy" in its entirety.
(14) Delete section 112 "Board of Appeals" in its entirety.
(15) Amend subsection 116.6 "Hearing" to read:
"Any person ordered to take emergency measures shall comply with such order forthwith. Any affected person shall thereafter, upon petition to the Board of Examination and Appeals for Construction Industries, be afforded a hearing as described in this code."
(16) Delete subsection 502.3 "Flood hazard areas" in its entirety."
(17) Amend subsection "707.1 Minimum requirements." To read.
Level 1 alterations to existing buildings or structures do not require the entire building or structure to comply with the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board. The alterations shall conform to the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board as they relate to new construction only.
(18) Amend subsection "810.1 Minimum requirements." To read.
Level 2 alterations to existing buildings or structures do not require the entire building or structure are permitted without requiring the entire building or structure to comply with the energy requirements of the current State of Alabama Energy Code or Residential Energy Code as adopted by the Alabama Energy and Residential Codes Board. The alterations shall conform to the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board as they relate to new construction only.
(19) Amend subsection "907.1 minimum requirements" to read.
Level 3 alterations to existing buildings or structures do not require the entire building or structure are permitted without requiring the entire building or structure to comply with the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board. The alterations shall conform to the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board as they relate to new construction only.
(20) Delete subsection (BS) 1103.3 "Flood Hazard Areas" in its entirety.
(21) Amend subsection 1107.1 "Minimum requirements" to read.
Additions to existing buildings shall conform to the energy requirements of the current State of Alabama Energy Code as adopted by the Alabama Energy and Residential Codes Board as they relate to new construction.
(22) Delete subsection 1201.4 "Flood Hazard Areas" in its entirety.
(23) Delete subsection (BS) 1301.3.3 "Compliance with flood hazard provisions" in its entirety.
(24) Amend subsection 1401.2 "Conformance" to read:
"The building shall be safe for human occupancy as determined by the International Fire Code. Any repair, alteration, or change of occupancy undertaken within the moved structure shall comply with the requirements of this code applicable to the work being performed. Any field-fabricated elements shall comply with the requirements of the International Building Code or the International Residential Code as applicable."
(25) Amend subsection 1301.3.2 "Compliance with Other Codes" to read:
Buildings that are evaluated in accordance with this section shall comply with the International Fire Code."
(26) Delete subsection (BS) 1301.3.3 "Compliance with flood hazard provisions." in its entirety.
(27) Amend subsection 1401.2 "Conformance" to read:
"The building shall be safe for human occupancy as determined by the International Fire Code. Any repair, alteration or change of occupancy undertaken within the moved structure shall comply with the requirements of this code applicable to the work being performed. Any field-fabricated elements shall comply with the requirements of the International Building Code or the International Residential Code as applicable."
(28) Delete subsection (BS) 1402.6 "Flood Hazard Areas" in its entirety.
(Ord. No. 21-1006, § 2, 11-18-2021, eff. 1-1-2022)