§ 55-145 — Compliance monitoring
Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 55-145
Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/f1e91afb-a8eb-4fae-bccf-cbdfe83abb80
Sec. 55-145. - Compliance monitoring.
(a) Inspection and sampling. Authorized representatives of the city, state, and federal governments have the right to enter the facilities of any industrial user during hours of plant operation or during times in which discharge is made to the POTW's collection system to ascertain whether the purpose of this article, and any permit or order issued hereunder is being met and whether the industrial user is complying with all requirements thereof. Minimally, the city shall inspect on an annual basis the premises of each significant industrial user and shall take at least one (1) sample from each significant industrial user each year, and may collect additional samples as needed. Industrial users shall allow the director or the director's representatives ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties. (1) Where an industrial user has security measures in force which require proper identification and clearance before entry into its premises, the industrial user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, personnel from the city, state, and federal agencies will be permitted to enter without delay, for the purposes of performing their specific responsibilities. (2) The city, state, and federal agencies shall have the right to set up on the industrial user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations. (3) The city may require the industrial user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the industrial user at its own expense. All devices used to measure wastewater flow and quality shall be calibrated (at the user's expense) as deemed necessary by the director to ensure their accuracy. (4) Any temporary or permanent obstruction to safe and easy access to the industrial facility to be inspected and/or sampled shall be promptly removed by the industrial user at the written or verbal request of the director and shall not be replaced. The costs of clearing such access shall be borne by the industrial user. (5) Unreasonable delays in allowing city personnel access to the industrial user's premises shall be a violation of this article. (6) Hours of operation of the plant and times during which the plant is making discharge to the POTW's collection system shall be deemed reasonable hours for entry of city inspectors for the purposes of this section. (b) Search warrants. Under Article 18.05, Texas Code of Criminal Procedure, if the director has been refused access to a building, structure or property or any part thereof, and if the director has demonstrated: (1) probable cause to believe that there may be a violation of this article; and (2) that there is a need to inspect as part of a routine inspection program of the city designed to verify compliance with this article, or any permit or order issued under this article, to protect the overall public health safety and welfare of the community, then upon application by the city attorney, through the code enforcement official, the municipal court judge of the city shall issue a search and/or seizure warrant describing therein the specific location subject to the warrant. The warrant shall specify what, if anything, may be searched and/or seized on the property described. Such warrant shall be served at reasonable hours by the director in the company of a uniformed police officer of the city. Hours during the user's plant operation or during user's discharge to the POTW's collection system shall be presumed reasonable hours of access. In the event of an emergency affecting public health and safety, inspections shall be made without the issuance of a warrant. (c) Confidential information. Information and data on an industrial user obtained from reports, surveys, wastewater discharge permit applications, wastewater discharge permits, and monitoring programs, and from city inspection and sampling activities, shall be available to the public without restriction, unless the industrial user specifically requests, and is able to demonstrate to the satisfaction of the director that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets under applicable state law. When requested and demonstrated by the industrial user furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public, but shall be made available immediately upon request to governmental agencies for uses related to the TPDES program or pretreatment program, and in enforcement proceedings involving the person furnishing the report. Any request for confidentiality must be clearly asserted in writing at the time the report is submitted. Wastewater constituents and characteristics and other "effluent data" as defined by 40 CFR 2.302 will not be recognized as confidential information and will be available to the public without restriction. (d) Publication of industrial users in significant noncompliance (SNC). The city shall publish annually, in compliance with EPA regulations and federal and state permits, in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW a list of the industrial users which, during the previous twelve (12) months or other periods as specified by federal and state law, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall mean: (1) Chronic violations of wastewater discharge limits defined here as those in which sixty-six (66) per cent or more of wastewater measurements taken for the same pollutant parameter taken during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits; (2) Technical review criteria (TRC) violations, defined here as those in which thirty-three (33) per cent or more of wastewater measurements taken for each pollutant parameter during a six-month period equals or exceeds the product of the numeric pretreatment standard or requirement including instantaneous limits multiplied by the applicable criteria (one and four-tenths (1.4) for BOD, TSS, COD, fats, oils and grease, and one and two-tenths (1.2) for all other pollutants except pH); (3) Any other discharge violation of a pretreatment standard or requirement (daily maximum, long-term average, instantaneous maximum limit, or narrative standard) that the city believes has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of city personnel or the general public); (4) Any discharge of pollutants that has caused imminent endangerment to the public or to the environment, or has resulted in the city's exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within ninety (90) days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide within thirty (30) days after the due date, any required reports, including baseline monitoring reports, ninety-day compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; (8) Failure to provide a plan for correction and prevention within forty-five (45) days after notice of and direction for submission to the city of a remedial action plan, as described in subsection 55-146(a). (9) Any other violation(s)), which may include a violation of BMPs, which the city determines will adversely affect the operation or implementation of the local pretreatment program.
(Ord. No. 21666, § 1, 6-1-1993; Ord. No. 25377, § 10, 7-22-2003; Ord. No. 032342, § 1, 2-9-2021)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.
