27.20.110 - Written findings.
To require a Contractor to use only the designated material or product, the Director must make a written finding that the material or product is designated for at least one of the following purposes:
A. To conduct a field test or experiment to determine suitability of the material or product for City use;
B. To match other materials or products already in use by the City, including, but not limited to, technology purchases required to achieve interoperability with existing hardware, software, systems or programs;
C. To obtain a necessary material or product that is available only from one source;
D. To respond to an imminent threat of harm to the health, safety or welfare of one or more persons as the result of an emergency; or
E. To achieve significant cost savings based upon consideration of the following factors:
1. Timeliness and quality of installation, repair and maintenance;
2. Quality of user training;
3. Supplies and replacement parts;
4. Modification of existing equipment, materials or systems;
5. Future upgrades and updates;
6. Estimated amount and cost of reasonably foreseeable future purchases of equipment that would be required to be compatible or functional with the designated manufacturer or product; and
7. Administrative costs.
(Ord. 30308.)