§ 33.430.240 — Supplemental Application Requirements
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.430.240
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/f24a5519-d7b4-4d26-a25a-7789d6cdfed1
33.430.240 Supplemental Application Requirements
In addition to the application requirements of Section 33.730.060, the following information is required for an environmental review application: A. Supplemental site plans required. One copy of each plan must be at a scale of at least one inch to 100 feet. The following supplemental site plans are required: • Existing conditions; • Conditions existing prior to a violation (if applicable); • Proposed development; • Construction management; and • Mitigation or remediation. A mitigation site plan is required whenever the proposed development will result in unavoidable significant detrimental impact on the identified resources and functional values. A remediation site plan is required whenever significant detrimental impacts occur in violation of the Code and no permit was applied for. The Director of PP&D may waive items listed in this Subsection if they are not applicable to the specific review; otherwise they must be included. Additional information such as wetland characteristics or soil type may be requested through the review process. 1. The existing conditions site plan must show the following for the entire site: a. Combined flood hazard area and floodway boundaries; b. Boundaries of the resource area and the transition area. These boundaries may be scaled in relation to property lines from the Official City Zoning Maps; c. Topography shown by contour lines at two foot vertical contours in areas of slopes less than ten percent and at five foot vertical contours in areas of slopes ten percent or greater; d. Drainage patterns, using arrows to indicate the direction of major drainage flow; and e. Existing improvements such as structures, or buildings, utility lines, fences, etc. 2. The proposed development site plan must show the following: a. Combined flood hazard area and boundaries of the resource area and the transition area; b. In areas of the site that have been or will be part of the permanent disturbance area, distribution outline of shrubs and groundcovers, with a list of most abundant species; c. In areas of the site that are and will remain undisturbed: Tree crown cover outline, and generalized species composition; d. A grading plan showing proposed alteration of the ground at two-foot vertical contours in areas of slopes less than ten percent and at five-foot vertical contours in areas of slopes ten percent or greater; e. Trees six or more inches in diameter, identified by species, with trees proposed to be preserved and removed indicated. In the case of violations, also indicate those that were cut or damaged by stump diameter and species; f. Proposed development, including proposed buildings, walkways, decks, retaining walls, bridges, garages, utility lines, stormwater management systems; and g. Proposed planting areas. 3. A construction management site plan must show the following: a. Combined flood hazard area and boundaries of the resource area and the transition area; b. Areas that will be temporarily or permanently disturbed, including equipment maneuvering areas, and perimeter controls; c. Areas where existing topography and vegetation will be left undisturbed; d. Location of site access and egress; e. Equipment and material staging and stockpile areas; f. Erosion control measures; and g. Measures to protect trees and vegetation. Tree protection must meet the requirements of Chapter 11.60, Technical Specifications. 4. A mitigation or remediation site plan must show the following: a. Dams, weirs, or other in-water structures; b. Distribution outline, species composition, number, and percent cover of groundcovers to be seeded or planted; c. Distribution outline, species composition, size, number, and spacing of shrubs to be planted; d. Location, species, number, and size of each tree to be planted; e. Stormwater management features, including retention, infiltration, detention, discharges, and outfalls; f. Water bodies to be created, including depth; g. Water sources to be used, including volumes; and h. Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings. B. Supplemental narrative. The following is required: 1. Impact evaluation. An impact evaluation is required to determine compliance with the approval criteria and to evaluate development alternatives for a particular site. The alternatives must be evaluated on the basis of their impact on the resources and functional values of the site. In the case of a violation, the impact evaluation is used to determine the nature and scope of the significant detrimental impacts. To the extent that the site resources and functional values are part of a larger natural system such as a watershed, the evaluation must also consider the cumulative impacts on that system. The impact evaluation is based on the resources and functional values identified as significant in the reports listed in section 33.430.020; a. An impact evaluation includes: (1) Identification, by characteristics and quantity, of the resources and their functional values found on the site; (2) Evaluation of alternative locations, design modifications, or alternative methods of development to determine which options reduce the significant detrimental impacts on the identified resources and functional values of the site; and (3) Determination of the alternative that best meets the applicable approval criteria and identify significant detrimental impacts that are unavoidable. b. An impact evaluation for a violation includes: (1) Description, by characteristics and quantity, of the resources and functional values on the site prior to the violation; and (2) Determination of the impact of the violation on the resources and functional values. 2. Construction management plan. Identify measures that will be taken during construction or remediation to protect the remaining resources and functional values at and near the construction site and a description of how undisturbed areas will be protected. For example, describe how trees will be protected, erosion controlled, construction equipment controlled, and the timing of construction; and 3. Mitigation or remediation plan. The purpose of a mitigation or remediation plan is to compensate for unavoidable significant detrimental impacts that result from the chosen development alternative or violation as identified in the impact evaluation. A mitigation or remediation plan includes: a. Resources and functional values to be restored, created, or enhanced on the mitigation or remediation site; b. Documentation of coordination with appropriate local, regional, special district, state, and federal regulatory agencies; c. Construction timetables; d. Operations and maintenance practices; e. Monitoring and evaluation procedures; f. Remedial actions for unsuccessful mitigation; g. Information showing compliance with Section 33.248.090, Mitigation and Restoration Plantings; and h. Advanced mitigation projects may be used as mitigation to offset detrimental impacts of future proposed development, to fulfill the site enhancement requirements of 33.430.185.E.2, the tree replacement requirements of 33.430.150.B.2.c, or tree replacement requirements of 33.430.185.D.1.c or 33.430.185.D.2.c. If the mitigation shown on the mitigation plan is intended to be used for any of these purposes, the narrative must include a statement to that effect.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
