§ 21-304 — Utility permits required; pre-application review

Code of Ordinances of the City of Tuscaloosa, Alabama (Codified through Ordinance No. 9809, enacted August 25, 2026 (Supp. No. 103, Update 1)) · Tuscaloosa Code of Ordinances § 21-304

Corpus is an independent public-information project, not the official City of Tuscaloosa website. Stable reference: corpuslaw.us/code/f2a9bd46-09a0-4e5c-b27e-c13a5f7d2779

Sec. 21-304. - Utility permits required; pre-application review.

(a) Requirement. (1) Before a grantee who holds a valid license issued under this division can install a small cell facility or support structure in the right-of-way the grantee shall apply with the city engineer for a utility permit for each proposed location, pay the required fees, and obtain a utility permit, except as otherwise provided in this division. The city engineer will review and administratively process an application in accordance with this division to determine if the application is complete and consistent with this division, the license issued under this division, and applicable codes and whether a utility permit for the small cell facilities or support structure should be issued for the location in the manner requested by the applicant, consistent with this division and applicable laws. The permitting process will be administrative and not require the approval of the city council, unless otherwise provided in this division. (2) A utility permit application must be submitted for each small cell facility or new support structure on a form, paper or electronic, provided by the city. If the applicant has a good faith belief that any information submitted is proprietary or confidential, then the applicant must mark each page accordingly. An application packet will be maintained by the city engineer. (3) The burden of proof shall at all times be on the applicant or grantee to establish compliance with requirements under this division and applicable law. (b) When utility permit not required. Subject to section 21-278 of division 2 concerning construction approval of the city engineer and to applicable code requirements, a utility permit and the one-time application fee shall not be required for small cell facilities and support structures that have already received a utility permit in the following instances: (1) For routine maintenance or repairs. (2) For modifications that do not appreciably change position, characteristic, size, or appearance of the existing facility, unless such change would violate a provision of this division, the license, or the utility permit. (c) Inspection. In addition to any inspections that may be required in connection with building and electrical permitting, the city reserves the right to inspect all small cell facility or support structure work to ensure compliance with this division, including applicable utility permits. Upon completion of a facility or support structure installation, the applicant or grantee shall provide a written notice and certification of compliance, as required by the city engineer, that the facilities or support structure were constructed in accordance with the approved specifications. No operation at the facility shall occur unless the city engineer, should they elect to do so, has conducted a final inspection and issued a certificate of completion, provided that if the city engineer elects not to inspect the site, the certificate of completion will be deemed issued within fourteen (14) days of the applicant's submission of its notice and certification of compliance, or upon any required final inspections and approvals required under applicable building and electrical permitting, whichever is later. (d) Pre-application review. Prior to the submission of an application, the applicant is encouraged to have a voluntary pre-application meeting with the city engineer to review preliminary documents and graphic exhibits of the proposed facilities or support structure and discuss the application, location, and design requirements for the proposed facilities. The primary purposes of the review are to streamline application processing and reduce site plan and design revisions, as well as the multiple reviews associated therewith. Any applicant desiring a pre-application review will agree in writing that the applicable timeline for application review, as set forth in section 21-310, will be tolled during such review period.

(Ord. No. 8935, 4-28-20)

Ask a question about Tuscaloosa law

Corpus searches the Tuscaloosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.