Sec. 35-152. - New pipelines.
(a) At least forty-five (45) days prior to the scheduled commencement of the construction of a new pipeline, the pipeline owner or operator shall notify the fire chief, or his designee, of its intention to construct the pipeline and shall submit the following information: (1) The name, business address, and telephone number of the pipeline owner and operator. (2) The names, titles, and telephone numbers of the following persons: a. The person submitting the information, b. The person designated as the principal contact for submittal information, c. The person designated as the twenty-four-hour emergency contact, d. The person or firm which will operate the pipeline. (3) The origin point and the destination of the segment of the pipeline. (4) A description of the substance to be transported through the pipeline. A copy of the substance safety data sheet (SDS) shall be included with the submittal. (5) The maximum allowable operating pressure on the pipeline as determined according to U.S. Department of Transportation and Texas Railroad Commission procedures. (6) The normal operating pressure range of the pipeline. (7) Engineering plans, drawings and/or maps with summarized specifications showing the horizontal pipeline location, pipeline covering depths, and location of shutoff valves. (Location of shutoff valves must be known in order for emergency responders to clear area for access to valves.) To the extent that information can be reasonably obtained, drawings shall show the location of other pipelines and utilities which will be crossed or paralleled within five (5) feet. (8) A description of the consideration given to matters of public safety and the avoidance, as far as practicable, of existing inhabited structures and congregated areas. (9) Detailed cross section drawings for all public street right-of-way and easement crossings. (10) The design criteria under which the pipeline will be constructed. (b) Within thirty (30) days following notification to the city, the director of engineering services, emergency management coordinator, city manager or his designee, and the pipeline owner or operator shall informally review for completeness and make technical comment on the submitted new pipeline information. At that time city staff shall make comments related to conditions or requirements under the City of Corpus Christi licensing policy on the pipeline use of public property. (c) At the time of notification to the city of the intent to construct the pipeline, the pipeline owner or operator shall give notice that the information provided in subsection (a) of this section is available to the public. Notice to the public shall be made in the daily local newspaper having the largest circulation in Corpus Christi. Notice shall be provided in the public notice section of at least five (5) successive issues and include the following information: (1) General description of planned activity. (2) Proposed pipeline construction area. (3) Type of material to be transported. (4) Pipeline owner or operator. (5) Location of proposed pipeline information for public review. (6) Scheduled location and time for new pipeline information meeting. In addition, an announcement of the scheduled location and time for the public information meeting shall be published concurrently in the local news section of two (2) successive issues of said newspaper in a size not less than two (2) columns by two (2) inches. (d) The public may review the proposed pipeline information made available pursuant to subsection (c) above, for a period of fourteen (14) days following the publication of the first public notice and submit comments, if any, within such period to both the director of engineering services and the pipeline owner or operator. (e) Within twenty (20) days of notification to the city of the intent to construct the pipeline, the pipeline owner or operator shall conduct a public information meeting. At this meeting the owner/operator shall review the proposed construction and operation of the new pipeline. (f) Following the public review period, but not more than forty-five (45) days following notification to the city of intent to construct a new pipeline, the pipeline owner/operator shall meet with the director of engineering services to review any public comments. If there are no substantive, nonresolvable technical issues, construction of the pipeline will proceed. If there are substantive, nonresolvable technical issues concerning matters that do not fall within the exclusive jurisdiction of the department of transportation or the Texas Railroad Commission, an administrative hearing shall be held within fourteen (14) days as provided in subsection (g) below. (g) An administrative hearing shall be conducted to seek resolution of any substantive, nonresolvable technical issues. The hearing will be conducted before the city manager or designee who will render a decision within seven (7) days of the date of such hearing. (h) Reserved. (i) All pipelines will be constructed repaired, and/or replaced in compliance with all statutory or regulatory requirements of the U.S. Department of Transportation and the Texas Railroad Commission. (j) The pipeline owner or operator will give notice of the commencement of pipeline construction to all residents and business establishments that are within three hundred (300) feet of the proposed centerline of the pipeline, but not less that forty-eight (48) hours prior to commencement of construction. (k) Upon completion of pipeline construction the pipeline owner or operator shall provide the city with as-built pipeline drawings within one hundred twenty (120) days. Accuracy of as-built drawings shall meet a survey level of one (1) foot to fifty thousand (50,000) feet. The drawings shall also be supplied in a workable electronic document with the location tied to one (1) nearby GPS (global positioning system) city monument. If the new pipeline length exceeds one thousand (1,000) feet within the city or its jurisdiction, the pipeline should be tied to at least two (2) GPS city monuments. (l) Any change in service of a pipeline not previously addressed by this article to gas, hazardous liquid, or chemical service must be reviewed in accordance with the new pipeline review procedure outline in subsections (a)—(g) of this section, as if it were new pipeline construction. (m) The city manager or his designee has the authority under this article to modify any of the procedural requirements in this section if it is in the best interest of the City of Corpus Christi.
(Ord. No. 21776, § 1, 10-19-1993; Ord. No. 21897, § 1, 3-15-1994; Ord. No. 031132, § 1, 5-9-2017; Ord. No. 031963, § 11, 12-17-2019)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.